Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (January 1, 2007)
- Case study:RESTORATION OF THE TRESENEC STREAM + (January 1, 2007)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (January 2007)
- Case study:Meades water garden regeneration project + (January 1, 2007)
- Case study:Restoration of Juottimenoja Brook + (January 1, 2007)
- Case study:Massadammen-dam removal in River Tabergsån + (2007)
- Case study:River Monnow (Going Native) + (2007)
- Case study:Salzano wetland and Marzenego river restoration project + (2007)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (2007)
- Case study:Keent + (January 1, 2007)
- Case study:Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park + (January 1, 2007)
- Case study:River Nith Diversion at Greenburn Surface Mine + (January 1, 2007)
- Case study:River Soar Floating Pennywort Eradication + (January 1, 2007)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (2007)
- Case study:Herinrichting beekdal Tongelreep + (January 1, 2007)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (January 1, 2007)
- Case study:River Valency at Boscastle + (March 1, 2007)
- Case study:Bastion Maria (QUERCUS) + (April 1, 2007)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (May 1, 2007)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (June 1, 2007)
- Case study:River Roding at Ray Lodge Park + (August 1, 2007)
- Case study:Inchewan Burn Bed restoration + (September 1, 2007)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (September 1, 2007)
- Case study:Glaisdale Beck diversion scheme + (September 21, 2007)
- Case study:Giving up the Weed + (October 1, 2007)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (October 1, 2007)
- Case study:Vester Nebel Restoration + (November 1, 2007)
- Case study:Restoration of the river area of the section of Betzuca stream + (November 1, 2007)
- Case study:Environmental improvement project of the stream of Ruby + (December 1, 2007)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (January 1, 2008)
- Case study:Buenz + (January 1, 2008)
- Case study:Buiten Ooij + (January 1, 2008)
- Case study:Kuuskoski-Fishway + (January 1, 2008)
- Case study:Restoration of Vakkolankoski Torrent + (January 1, 2008)
- Case study:Chambers Wharf + (January 1, 2008)
- Case study:Rams Brewery + (January 1, 2008)
- Case study:Manor Park + (January 1, 2008)
- Case study:Water of Dye Fish Pass Project + (2008)
- Case study:Regeneration of the banks of the river Mape + (January 1, 2008)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (January 1, 2008)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (January 1, 2008)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (January 1, 2008)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (January 1, 2008)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (January 1, 2008)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (January 1, 2008)
- Case study:Restoration project in Verde River + (January 1, 2008)
- Case study:Apelnäs fishway at River Rolfså + (2008)
- Case study:Mayesbrook Climate Change Park restoration project + (January 1, 2008)
- Case study:River Wandle Restoration Project + (January 1, 2008)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (2008)
- Case study:The Environmental River Enhancement Programme + (January 1, 2008)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (January 1, 2008)