Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (February 1, 2001)
- Case study:Nigg Bay Managed Realignment Scheme + (March 1, 2001)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (April 1, 2001)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (July 1, 2001)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (July 1, 2001)
- Case study:River Rhee + (September 1, 2001)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (November 1, 2001)
- Case study:Restoration of Myllypuro brook + (January 1, 2002)
- Case study:Silverån övre + (January 1, 2002)
- Case study:Thur + (January 1, 2002)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (2002)
- Case study:Restoration of Naarkoski Torrent + (January 1, 2002)
- Case study:Restoration of Ingarskilanjoki River + (January 1, 2002)
- Case study:Blanice River + (January 1, 2002)
- Case study:Dam removal at Grönkullen, River Rolfsån + (2002)
- Case study:Pagana canal restoration project + (2002)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (January 1, 2002)
- Case study:New Forest Life III project + (January 1, 2002)
- Case study:North Norfolk Coast + (2002)
- Case study:River Quaggy- Chinbrook meadows + (March 1, 2002)
- Case study:Restoration of the Erft-river in Weilerswist + (April 1, 2002)
- Case study:Holmsley Inclosure Stream Restoration + (July 1, 2002)
- Case study:Markway Stream Restoration + (July 1, 2002)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (August 1, 2002)
- Case study:River Tame at Salford Park ("SMURF") + (August 1, 2002)
- Case study:SMURF Tame + (August 1, 2002)
- Case study:Langford Lakes project + (October 1, 2002)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (October 1, 2002)
- Case study:PHish - Powys Habitat Improvement Scheme + (October 1, 2002)
- Case study:River Avon Stream project + (December 1, 2002)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (January 1, 2003)
- Case study:River Glaven conservation group + (January 1, 2003)
- Case study:Room for the River + (January 1, 2003)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (January 1, 2003)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (January 1, 2003)
- Case study:The Wye & Usk Passport + (January 1, 2003)
- Case study:Tweed Catchment Management Plan + (January 1, 2003)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (January 1, 2003)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (January 1, 2003)
- Case study:South Milton Sands + (January 1, 2003)
- Case study:Restoration in Bognelva + (January 1, 2003)
- Case study:The Ciobarciu Wetland Project + (March 1, 2003)
- Case study:Recovery "CañoTravieso" + (May 1, 2003)
- Case study:New Forest LIFE project + (June 1, 2003)
- Case study:Restoration and fish migration enhancement in the Wachau Valley + (June 1, 2003)
- Case study:PROGETTO WETLAND - Volturno + (August 1, 2003)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (August 1, 2003)
- Case study:Recovery of the functionality of Brazo de la Torre + (October 1, 2003)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (January 1, 2004)
- Case study:Ems floodplain + (January 1, 2004)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (January 1, 2004)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (January 1, 2004)
- Case study:Improving the structure of the Lahn-patak in Hungary + (January 1, 2004)
- Case study:Long Preston Deeps Flood Plain Project + (January 1, 2004)
- Case study:Litter Clear-Ups (Since 2004) + (2004)
- Case study:UP! - The Usk Project + (January 1, 2004)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (January 1, 2004)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (February 1, 2004)
- Case study:Voorste Nete at Dessel + (April 1, 2004)
- Case study:Restoration of the previous riverbed of the Dadon + (May 1, 2004)
- Case study:River Dulais Restoration Project + (May 1, 2004)