Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Borova Stream and its Revitalisation + (January 2, 1994)
- Case study:River Little Ouse at Thetford + (April 1, 1994)
- Case study:Reconnecting the Rivers + (January 1, 1995)
- Case study:Salmon Conservation + (1995)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (January 1, 1995)
- Case study:Restoration of side channels of the Loire and its tributaries + (January 1, 1995)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (January 1, 1995)
- Case study:River Dearne at Mexborough + (May 1, 1995)
- Case study:Tall River + (July 1, 1995)
- Case study:Refilling the meanders of the Colostre + (January 1, 1996)
- Case study:Fluvial restoration in River Carrión + (January 1, 1996)
- Case study:Regelsbrunner Aue + (January 1, 1996)
- Case study:Lippeaue Klostermersch + (January 1, 1996)
- Case study:National Park Danube-Auen + (January 1, 1996)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (September 1, 1996)
- Case study:Greenwich Peninsula + (January 1, 1997)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (January 1, 1997)
- Case study:Restoring the natural dynamics of the upper Adour + (January 1, 1997)
- Case study:Levington Saltmarsh Restoration, Suffolk + (1997)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (January 1, 1997)
- Case study:Restoration of the river Børselva + (January 1, 1997)
- Case study:Restoration of the stream of the Partido + (January 1, 1998)
- Case study:Isar-Plan + (January 1, 1998)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (January 1, 1998)
- Case study:Bird reserve “El Clot” (Tarragona) + (January 1, 1998)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (April 1, 1998)
- Case study:Guadiamar Green Corridor Project + (April 1, 1998)
- Case study:WHIP - The Wye Habitat Improvement Project + (April 1, 1998)
- Case study:River Ogwen and Nant Francon + (September 1, 1998)
- Case study:Boosting slivso + (January 1, 1999)
- Case study:Vreugderijkerwaard side channel + (January 1, 1999)
- Case study:Harbertonford Flood Alleviation Scheme + (January 1, 1999)
- Case study:Zero river restoration project + (January 1, 1999)
- Case study:Tungelroyse beek + (January 1, 1999)
- Case study:Traditioneel Beekherstel Koffiegoot + (January 1, 1999)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (January 1, 1999)
- Case study:Restoration of spawning grounds for trout in Bjornesfjorden (Hardangervidda) + (January 1, 1999)
- Case study:River Marden at Calne + (March 1, 1999)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (May 1, 1999)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (October 1, 1999)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (November 1, 1999)
- Case study:The Fortuna Restoration Project + (December 1, 1999)
- Case study:Langonnet river + (January 1, 2000)
- Case study:Restoration of Siuruanjoki River + (January 1, 2000)
- Case study:Restoration of a stream of the Jarama River, Valdetorres de Jarama + (January 1, 2000)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (January 1, 2000)
- Case study:Pumlumon Peatland Restoration for Floodwater Management + (2000)
- Case study:Pevensey Sea Defences + (2000)
- Case study:Bird reserve “O Grove” (Pontevedra) + (January 1, 2000)
- Case study:Rother meander reconnection + (March 1, 2000)
- Case study:Norman Park Bromley. + (March 1, 2000)
- Case study:River Wensum Rehabilitation Project - Bintree + (August 1, 2000)
- Case study:Wensum River Restoration Strategy + (August 1, 2000)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (January 1, 2001)
- Case study:Bakenhof Dyke reconstruction + (2001)
- Case study:Amerongse Bovenpolder + (January 1, 2001)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (February 1, 2001)
- Case study:Nigg Bay Managed Realignment Scheme + (March 1, 2001)