Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Clugston Burn (CASS) + (July 1, 2005)
- Case study:Restoration of riparian zone in Aragon River + (August 1, 2005)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (August 1, 2005)
- Case study:Bleinheim Palace Project + (September 1, 2005)
- Case study:Restoration of Vesselina River + (September 1, 2005)
- Case study:Loutre BeLu: Restoration of European otter habitats (Belgium & Luxemburg) + (October 1, 2005)
- Case study:Ecological Restoration of Natural Lake Pochina + (November 1, 2005)
- Case study:Ecological Restoration of Vlascuta Lake + (November 1, 2005)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (November 1, 2005)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (January 1, 2006)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (January 1, 2006)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (January 1, 2006)
- Case study:Sågarsfors + (January 1, 2006)
- Case study:Restoration of Longinoja brook + (January 1, 2006)
- Case study:Restoration of Koskenkylänjoki River + (January 1, 2006)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (January 1, 2006)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (January 1, 2006)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (January 1, 2006)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (January 1, 2006)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (January 1, 2006)
- Case study:Babingley River at Hillington + (2006)
- Case study:Wallasea (North) Managed Realignment + (January 1, 2006)
- Case study:The Lugg & Arrow, Leader + + (January 1, 2006)
- Case study:The Tubney Charitable Trust + (2006)
- Case study:Knepp Rewilding Project + (January 1, 2006)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (January 1, 2006)
- Case study:Černý potok stream restoration scheme + (February 1, 2006)
- Case study:River Alt at Knowsley + (February 1, 2006)
- Case study:RSPB Fowlmere Nature Reserve + (March 1, 2006)
- Case study:QUERCUS Ravensbourne + (June 1, 2006)
- Case study:Valtellina 2005 – New green system + (June 1, 2006)
- Case study:Ladywell Fields (QUERCUS) + (June 1, 2006)
- Case study:QUERCUS Dee + (June 1, 2006)
- Case study:Lugg & Arrow, Radnorshire + (June 1, 2006)
- Case study:Rural Enterprise Scheme + (August 1, 2006)
- Case study:Vallacuera Ravine. Removal of a dyke + (September 1, 2006)
- Case study:Reopening of the culverted Redon river + (September 1, 2006)
- Case study:Biomura LIFE06NAT/SI/000066 + (October 1, 2006)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (January 1, 2007)
- Case study:RESTORATION OF THE TRESENEC STREAM + (January 1, 2007)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (January 2007)
- Case study:Meades water garden regeneration project + (January 1, 2007)
- Case study:Restoration of Juottimenoja Brook + (January 1, 2007)
- Case study:Massadammen-dam removal in River Tabergsån + (2007)
- Case study:River Monnow (Going Native) + (2007)
- Case study:Salzano wetland and Marzenego river restoration project + (2007)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (2007)
- Case study:Keent + (January 1, 2007)
- Case study:Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park + (January 1, 2007)
- Case study:River Nith Diversion at Greenburn Surface Mine + (January 1, 2007)
- Case study:River Soar Floating Pennywort Eradication + (January 1, 2007)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (2007)