Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bakenhof Dyke reconstruction + (January 1, 2004)
- Case study:Zero river restoration project + (January 1, 2004)
- Case study:Restoring the natural dynamics of the upper Adour + (January 1, 2004)
- Case study:Nigg Bay Managed Realignment Scheme + (March 1, 2004)
- Case study:River Dulais Restoration Project + (May 31, 2004)
- Case study:Voorste Nete at Dessel + (June 1, 2004)
- Case study:River Cleddau + (July 31, 2004)
- Case study:Restoration of Kalajoki River + (September 2, 2004)
- Case study:Pagana canal restoration project + (October 1, 2004)
- Case study:Skjern River Project + (December 31, 2004)
- Case study:Restoration of side channels of the Loire and its tributaries + (January 1, 2005)
- Case study:River Ebbw Bank Stabilisation + (April 3, 2005)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (July 31, 2005)
- Case study:River Tame at Salford Park ("SMURF") + (July 31, 2005)
- Case study:SMURF Tame + (July 31, 2005)
- Case study:River Darent at Hawley Manor + (September 25, 2005)
- Case study:Dam removal at Grönkullen, River Rolfsån + (October 31, 2005)
- Case study:Clugston Burn (CASS) + (December 31, 2005)
- Case study:Lower River Roding Regeneration Project + (March 31, 2006)
- Case study:Barking Creekmouth + (March 31, 2006)
- Case study:Barking Creek near A13 + (March 31, 2006)
- Case study:Cuckolds Haven Nature Area + (March 31, 2006)
- Case study:Mill Pool + (March 31, 2006)
- Case study:River Hogsmill Restoration Project + (July 20, 2006)
- Case study:River Alt at Knowsley + (October 1, 2006)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (December 31, 2006)
- Case study:Holmsley Inclosure Stream Restoration + (December 31, 2006)
- Case study:Markway Stream Restoration + (December 31, 2006)
- Case study:Reopening of the culverted Redon river + (January 1, 2007)
- Case study:Babingley River at Hillington + (February 1, 2007)
- Case study:Rural Enterprise Scheme + (April 1, 2007)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (July 31, 2007)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (August 31, 2007)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (August 31, 2007)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (October 31, 2007)