Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Valley Brook Restoration Project + (Valley Brook Crewe)
- Case study:Bristol Frome Diffuse Pollution Project + (Valuable topsoil and nutrients entering the Ladden Brook from agricultural run-off)
- Case study:Restoration of Vesselina River + (Vasselina River area)
- Case study:Great Ryburgh End Restoration Scheme + (Vegetated berm and woody debris creating flow and habitat diversity within link channel – August 2013. Photo credit RRC)
- Case study:Mill Pool + (View from the new seating area overlooking the Lower Roding in Barking)
- Case study:Bourne End Recreation Ground River Enhancement Project + (View of completed works, 18th Feb 2016)
- Case study:Aston Clinton River Restoration + (View of newly created watercourse)
- Case study:Woodsford Channel + (View of one of the LWD structures installed as part of the Woodsford Channel Project)
- Case study:Longford Community Nature Park Reedbed Restoration Project + (View of reedbed showing baffles jutting into pool)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (View of the project area. Stržen's riverbed (straight channel and former meanders) is visible in the top half of the photo.)
- Case study:Knepp Rewilding Project + (View of the river from the tree platform)
- Case study:Bastion Maria (QUERCUS) + (View towards Bastion Maria, Spring 2007)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Restoring Brent Rivers and Communities + (Volunteer Photographing river Brent at Quainton Street Open Space)
- Case study:Pickering Beck & Dutchy Water improvement project + (Volunteer-led in-channel works in progress)
- Case study:River Wandle: Silt & SuDs + (Volunteers adding Siltex to Carshalton Ponds in November 2014. Please seek permission from the Wandle Trust to reuse this photograph.)
- Case study:Zeegserloopje + (WFD water bodies in the Hunze en Aa's water authority region. The Zeegserloopje is part of the Drentse Aa water body.)
- Case study:Anloërdiepje + (WFD water bodies in the Hunze en Aa's water authority region. The Anloërdiepje is part of the Drentse Aa water body.)
- Case study:Taarlosche Diep + (WFD water bodies in the Hunze en Aa's water authority region. The Taarlosche Diep is part of the Drentse Aa water body.)
- Case study:Gastersche Diep + (WFD water bodies in the Hunze en Aa's water authority region. The Gastersche Diep is part of the Drentse Aa water body.)
- Case study:Hunze bij Torenveen + (WFD water bodies in the Hunze en Aa's water authority region.)
- Case study:River Seaton: Abandoned Metal Mines + (Waste tips at South Caradon mine)
- Case study:Wensum River Restoration Strategy + (Wensum at Great Ryburgh, July 2011 (post-restoration))
- Case study:Restoration of River Kävlingeån in Klingavälsån Naturreserve + (Wetland and meandering new stream in River Kävlingeån (photo. Outi Laamanen))
- Case study:Malltraeth Marsh + (Wetland and open water restoration, Malltraeth Marsh.)
- Case study:Glenbrook Wetlands + (Wetland basin 2 - Jan 2016)
- Case study:Upper Witham Restoration + (Wetted floodplain at Manthorpe following restoration)
- Case study:Medmerry Managed Realignment Scheme + (Whole Medmerry site aerial view - March 2012)
- Case study:Beekherstel Willinkbeek + (Willinkbeek)
- Case study:Minsterley Brook Abandoned Metal Mines + (Wood Adit)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (Woody Debris Flow Deflectors in River Stour near Great Bradley)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Work in progress - June 2014. The photograph highlights the dramatic new landform before the river went 'live' in September 2014)
- Case study:LIFE Saramugo + (Work on the refurbishment of a section of the Safareja stream has been successfully completed.)
- Case study:New South Quarter - Croydon + (computerised image of the river running through the development)
- Case study:Barking Creekmouth + (during construction)
- Case study:Barking Creek near A13 + (during construction)
- Case study:Enler River enhancement project + (finished reach Enler River)
- Case study:Quaggy channel improvements + (gravel introduced into the channel and new wall)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (http://projektwebbar.lansstyrelsen.se/rolfsan/Sv/folj-atgardsarbetet/rolfsan/Pages/rolfsan.aspx)
- Case study:Cuckolds Haven Nature Area + (interpretation panel)
- Case study:Narborough Rehabilitation Project + (just post works)
- Case study:Drayton + (location map)
- Case study:Nine Chalk Rivers Project - Stiffkey Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (location map)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (location of Glaven Catchment)
- Case study:Dagenham Washlands Phase 2 + (map of the project)