Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Upper Welland Water Friendly Farming Project + (Sediment accumulation behind a WFF project ditch dam (Game and Wildlife Conservation Trust))
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Sharpsbridge rock ramp scheme post works © Royal HaskoningDHV)
- Case study:Sheephouse Wood Mine Water Treatment Scheme + (Sheephouse Wood mine water treatment scheme)
- Case study:Removing Sheepmount weir, River Caldew, Carlisle, Cumbria + (Sheepmount weir, River Caldew, Carlisle, Cumbria)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Sherston River Project)
- Case study:River Adur - Shipley weir removal + (Shipley weir)
- Case study:Restoration of Wandle Park + (Site Location Plan)
- Case study:Lullingstone Castle + (Site locations (North West Kent Countryside Partnership))
- Case study:River Dearne at Mexborough + (Site plan for the restored reach)
- Case study:Greater Thames Estuary Fish Migration Roadmap + (Snapshots of the interactive map.)
- Case study:The Pow Beck Improvement Project + (Soil husbandry workshops in the Pow Beck catchment)
- Case study:Voorste Nete at Dessel + (Source of photographs - ECRR 2008. Upper r … Source of photographs - ECRR 2008. Upper row (left and right): original reach of the Voorste Nete. Middle row (left and right): Excavation of a 5 m wide stretch for placing the bentonite mat and refilling with the original sand. Bottom row (left and right): Diverted reach of the Voorste Nete, dug out in sand filled bentonite lining with transferred substrate from the original reach, and the same stretch 6 months later during first monitoring showing the changes in dimensions caused by a summer storm in 2004.mensions caused by a summer storm in 2004.)
- Case study:Revitalization, biodiversity protection and usage of the Vistula River oxbows; preventing degradation of Upper Vistula River Valley as an ecological corridor. + (Spytkowice)
- Case study:Adams Mill enhancements + (Stabilization work commences)
- Case study:Inturia dam removal + (Stages of the Inturia dam Removal. The image shows the comparison with the initial state and the results of the first two stages of the project and also the reduced height in each year. Photo credits: Irekia.)
- Case study:River Tutt Restoration Project + (Staveley Nature Reserve, scrape creation)
- Case study:Dam removal in River Stenån + (Stenån River Valley (photo.Outi Laamanen))
- Case study:Isar-Plan + (Straightened Isar (left) and restored diversified channel (Right))
- Case study:Allt Lorgy River Restoration + (Straightened section of the Allt Lorgy Burn)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (Summary of the projec (According to EPTB Bresle))
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (Summary of the project (Source: Smage Aa).)
- Case study:Saving Chiswick Eyot + (Surface of the Eyot showing features and elevation)
- Case study:Restoration of the River Korvajoki + (THe River Korvajoki after restoration year 2013 (photo J. Huhtala))
- Case study:Kentchurch Weir Removal + (The 2 metre high Kentchurch Weir, prior to removal. Courtesy of Atkins.)
- Case study:The Babina Restoration Project + (The Babina - present situation)
- Case study:Carnon River: Abandoned Metal Mines + (The County Adit)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (The Drugeon at Bonnevaux: many meanders are reconnected and recreated and the straightened channel is filled.)
- Case study:Irpin river restoration + (The Irpin River, right tributary of the Dnieper River west of Kiev, Ukraine (photo Vasiliy Kostyushin))
- Case study:Logie Burn Restoration Project + (The Logie Burn before (left; upstream end of first meander looking downstream) and after (right; same section of first meander))
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River in the early 21th century, after the motorways burial and the construction of a huge river park, but still with the weirs closed along the rivercourse (Photo source: Madrid City Council and CEDEX).)
- Case study:Merikoski fishway + (The Merikoski Fishway (Photo: Pinja Kasvio))
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (The Montvaux stream before and after restoration works.)
- Case study:The Podspády – Protected Area Bor – natural water retention by beaver weir + (The Natural water measures in basin Javorinka 2014 (photo by Mosny) GWP Eastern Europe)
- Case study:Odder Stream Restoration + (The Odder before (left) and after (right) restoration)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (The RTE at Beltringharder Koog - Google Earth derived aerial view)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (The RTE at Lippenbroek - Google Earth derived aerial view)
- Case study:Harrow Lodge Park + (The Ravensbourne before restoration)
- Case study:River Irwell Restoration Project + (The Red River)
- Case study:Restoration of the River Keskijoki + (The River Keskijoki.)
- Case study:Restoration of the River Paasonjoki + (The River Paasonjoki after the restoration (photo J. Huhtala))
- Case study:Restoration of Porvoonjoki + (The River Porvoonjoki)
- Case study:River Tame at Salford Park ("SMURF") + (The River Tame at Salford Park)
- Case study:River Wensum Rehabilitation Project - Bintree + (The River Wensum)
- Case study:Gategill Beck: Abandoned Metal Mines + (The Wood End low level adit)
- Case study:Wye (Herefordshire) Improvement Project (WHIP2) + (The Wye catchment area)
- Case study:Wild Wylye Phase 1 + (The Wylye used to be over wide and straight, particularly on this stretch. Brushwood structures installed alternating on both banks have helped recreate (in-channel) sinuostity.)
- Case study:Zero river restoration project + (The Zero river at the beginning of the restored portion)
- Case study:Friends of Afon Llwyd (FOAL) + (The area the FOAL Project worked on)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (The artificial meander created at the Haukås wetland. The first batch of freshwater pearl mussels were put out in 2016, with plenty more set out in 2017. Source: Johnsen et al 2018 (Rådgivende biologer report 2629))
- Case study:Blanice River + (The bypass under construction. Depositing of boulders on the banks and into the sill across the stream. (V. Šámal))
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (The channel before works)