Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of Kalajoki River + (Restoration of Museokoski torrent (photo: Kimmo Aronsuu ))
- Case study:Restoration of the river continuity on the Touques Basin + (Restoration of free movement of migratory fish in the basin of the Touques between 1980 and 2009 (Arnaud Richard, Onema))
- Case study:Rottal Burn + (Restoration of the historic meandering channel)
- Case study:Ddu Restoration Project + (Restoration of the river)
- Case study:Restoration of Ingarskilanjoki River + (Restored Knutsinvirta (photo: Harri Aulaskari))
- Case study:Restoration for fishery in the river Hammonjoki + (Restored area in the rapids of Koveroinen (photo Pinja Kasvio))
- Case study:River Ogwen and Nant Francon + (Restored bed level and bank profile following restoration (Nov 2012))
- Case study:River Avon at East Chisenbury + (Restored channel - berm feature installed to narrow channel. Courtesy of the River Restoration Centre.)
- Case study:Lodge Burn Flood Alleviation Scheme + (Restored channel in Anderson Park - site of former pond. Channel constrained by hidden gabion baskets to restrict lateral migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland).)
- Case study:Rother meander reconnection + (Restored channel shortly after works)
- Case study:Markway Stream Restoration + (Restored meander)
- Case study:Spring Meadow Meander Restoration + (Restored meander eighteen months after project works finished, looking upstream © RRC, July 2014)
- Case study:River Tat Restoration Scheme + (Restored section of River Tat, March 2014)
- Case study:Sculthorpe Moor Restoration Scheme + (Restored section of Wensum at Sculthorpe Moor)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Return of diversified flows on the Fontenelle, 8 months after the restoration (Arnaud Rosan, SMBVCS))
- Case study:Westborough + (Reveted bank at Westborough post works)
- Case study:Pipeline and WFD Project 2 + (Revetment work to prevent erosion on the upper Wye tributary, the Clywedog, carried out with funding from WFD.)
- Case study:Oughtershaw NFM + (Riparian Buffer Strips and Tree Planting)
- Case study:Craigton Riparian and NFM Orchard Planting + (Riparian trees planted along the bank of the river, connecting to remnant riparian woodland and covering areas of the bank embankment that are breached earliest by out of channel flow.)
- Case study:Sunrise, River Trent, Staffordshire University + (Riparian zone restoration Sept 2020)
- Case study:Restorations of Ritobäcken brook + (Rirobacken brook after restauration_summer 2011 (photo: Airi Kulmala))
- Case study:Kirkstall Valley Weir Fish Passes Project + (River Aire - St Ann's Mill Weir c.The Aire Rivers Trust)
- Case study:Restoration of the river Akerselva + (River Akerselva at the Kuba Park (Kubaparken) in 2016. Photo: Oslo Municipality, Agency for Urban Environment.)
- Case study:Riverlands Porlock Vale Streams + (River Aller Stage 0)
- Case study:Charlton St Peter A 8 + (River Avon)
- Case study:River Bure + (River Bure - following restoration)
- Case study:River Calder improvement project + (River Calder, downstream of Padiham weir deconstruction)
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (River Crane at Cranebank)
- Case study:Water of Dye Fish Pass Project + (River Dee Trust fish passage easement through two manmade obstructions on the Water of Dye (works in 2008).)
- Case study:Dove Weir removal + (River Dove downstream of weir removal, with introduced woody debris)
- Case study:River Dulais Restoration Project + (River Dulais one year after restoration works completed. Courtesy of RRC)
- Case study:Bleinheim Palace Project + (River Evenlode, post restoration)
- Case study:River Frome Rehabilitation Plan + (River Frome Dorset)
- Case study:Restoration of the River Impiönjoki + (River Impiönjoki after the restoration (photo J.Huhtala))
- Case study:Source to Sea Programme – 8. River Keer Restoration + (River Keer - Stretch of river prior to new fencing being installed)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (River Kent - Croys and unfenced grasslands)
- Case study:Source to Sea Programme + (River Lune - Source to Sea area)
- Case study:River Monnow (Going Native) + (River Monnow after invasive non-native species removal)
- Case study:Castle Acre Rehabilitation Project + (River Nar SSSI at Castle Acre)
- Case study:Nar SSSI project + (River Nar after the work was completed)
- Case study:River Pool Linear Park Enhacement + (River Pool mid-restoration, April 2012)
- Case study:Source to Sea Programme – 11. River Rawthey + (River Rawthey)
- Case study:River Roding at Ray Lodge Park + (River Roding after the restoration project)
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (River Roeburn - Replacement road crossing - fish easement)
- Case study:River Somer channel enhancement, Midsomer Norton + (River Somer on the high street post-restoration (Woodland water and gardens))
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (River Suonnanjoki after the restoration work (photo J. Huhtala))
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (River Tame in Perry Hall playing fields, after scheme.)
- Case study:SMURF Tame + (River Tame in Perry Hall playing fields, after scheme.)
- Case study:Sherborne Windrush Restoration Project + (River Windrush)
- Case study:Langford Lakes project + (River Wylye, Langford Lakes restoration)
- Case study:Watercress Farm Rewetting Project + (River channel at Belmont Estate)