Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Matanza-Riachuelo + (Phytoremediation of the banks with native plants)
- Case study:Pearls in Peril LIFE+ GB Project + (PiP logo)
- Case study:Pearls in Peril LIFE+ GB Project - Mingary Burn + (PiP logo)
- Case study:Diversion of the River Nith + (Plan of 2000 Nith channel diversion. From RRC Manual of Techniques (2002) - courtesy of the River Restoration Centre.)
- Case study:River Marden at Calne + (Plan of restored reach)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Plan of works at Mill House (image courtesy of A.Girdler at A.G.A Group). Picture reference - see "Project summary")
- Case study:Houndsden Road Rain Gardens + (Planted swale April 2015)
- Case study:Hoffer Brook + (Plastic mesh base for gravel)
- Case study:Tidal Dee Love my Estuary + (Pollution Prevention Pack cover)
- Case study:Upper River Witham : Easton + (Post Restoration)
- Case study:River Worfe Restoration Initiative + (Poster of the project)
- Case study:Adare Fish Counter + (Poured counter beds)
- Case study:Cudworth dyke restoration project + (Pre works photo of area)
- Case study:River of Life + (Pre-project bank line at the River of Life project site (River Restoration Centre))
- Case study:Diffusing the Issue in rural Ribble + (Previously drained rush infested pasture returned to re-wetted open grazing pasture for wading birds and other wetland wildlife. The site now also provides areas that reduce run off rates and trap sediment by retaining water on-site year round.)
- Case study:River Rea Restoration Project + (Project Area)
- Case study:ReNaturalize + (Project ReNaturalize River Mangaraí ES Brazil)
- Case study:Plough Hill Farm Meander and Wet meadow restoration + (Project Site)
- Case study:Manthorpe Floodplain Reconnection + (Project after completion.)
- Case study:Wyndham Park, Grantham + (Project after completition)
- Case study:Dysart Park, Grantham Habitat Improvement + (Project after establishment and naturalisation.)
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Project site map)
- Case study:Restoration of side channels of the Loire and its tributaries + (Projects in the River Loire. BD carthage et agences de l’eau Source: Conseil supérieur de la pêche (CSP), PLGN unit (2005).)
- Case study:Prologis Midpoint Park river restoration scheme + (Prologis Midpoint Park River restoration scheme)
- Case study:Weir removal at Tile Kiln Park + (Pymmes Brook looking upstream nearing completion)
- Case study:Queensbury Recreation Ground + (Queensbury Park)
- Case study:Beekherstel Ramsbeek + (Ramsbeek)
- Case study:Ravensbury Park back channel + (Ravensbury Park Back Channel © Wandle Trust)
- Case study:Highland Water at Warwickslade Lawn + (Re-meandered section of the restored river)
- Case study:River Glyme Stratford Restoration + (Re-meandering the Glyme by James Aylward)
- Case study:Habitat measures in Strynevassdraget + (Reconnection of an oxbow lake under a gravel road along the Strynevassdraget. Source: Ole Dag Auflem)
- Case study:Barnes Common improvements + (Reed bed - May 2011)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (Remeandered River Lyvennet, Maulds Meaburn, Penrith, Cumbria)
- Case study:More space for the river Orbigo + (Removal of embankment along the Orbigo)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs in the Mandalselva river in connection to efforts to make earlier unproductive zones accessible as spawning and growing areas for salmon. Foto: Agder Energi)
- Case study:Restorations of River Nolån-Hulta dam removal + (Removed dam (photo.Maria Arola))
- Case study:Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria + (Removing Carleton Hall weir in the River Eamont, Eamont Bridge, Penrith, Cumbria 25 August 2016)
- Case study:Ems floodplain + (Renatured river section of the Ems)
- Case study:Reopening of the culverted Redon river + (Reopening of 230 metres of the Redon. Overview of the site after restoration work -2009 (River next to parking lot) (Symasol).)
- Case study:Restoration of Kalajoki River + (Restoration of Museokoski torrent (photo: Kimmo Aronsuu ))
- Case study:Restoration of the river continuity on the Touques Basin + (Restoration of free movement of migratory fish in the basin of the Touques between 1980 and 2009 (Arnaud Richard, Onema))
- Case study:Rottal Burn + (Restoration of the historic meandering channel)
- Case study:Ddu Restoration Project + (Restoration of the river)
- Case study:Restoration of Ingarskilanjoki River + (Restored Knutsinvirta (photo: Harri Aulaskari))
- Case study:Restoration for fishery in the river Hammonjoki + (Restored area in the rapids of Koveroinen (photo Pinja Kasvio))
- Case study:River Ogwen and Nant Francon + (Restored bed level and bank profile following restoration (Nov 2012))
- Case study:River Avon at East Chisenbury + (Restored channel - berm feature installed to narrow channel. Courtesy of the River Restoration Centre.)
- Case study:Lodge Burn Flood Alleviation Scheme + (Restored channel in Anderson Park - site of former pond. Channel constrained by hidden gabion baskets to restrict lateral migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland).)
- Case study:Rother meander reconnection + (Restored channel shortly after works)
- Case study:Markway Stream Restoration + (Restored meander)
- Case study:Spring Meadow Meander Restoration + (Restored meander eighteen months after project works finished, looking upstream © RRC, July 2014)