Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Harbertonford Flood Alleviation Scheme + (Illustration of proposed works. Courtesy of Bradley et al.(Available at http://www.britishdams.org/2004conf/papers/bradley.PDF).)
- Case study:Western Rother Fishery Habitat Enhancement + (Image of the Rother pre-restoration)
- Case study:La Gotera dam removal + (Image of the removal works of La Gotera dam. Photo Credits: Ministry of Agriculture and Fishing, Food and Environment (MAPAMA).)
- Case study:Southington River Restoration Project + (Image showing location of removed structure and newly improved surrounding area)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Improvement works)
- Case study:Houghton 'trout stream' enhancements + (Installation of a mid-channel 'v' deflector to create and maintain clean gravels)
- Case study:Fairham Brook Restoration Project + (Installation of coir rolls at Gotham)
- Case study:River Calder Large Wood Structure installation + (Installing LWS at the upstream end of the project reach.)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Interreg Med Wetnet)
- Case study:Restoration of Juottimenoja Brook + (Juottimenoja after restoration (photo: Liisa Laitinen).jpg)
- Case study:Beekherstel Keersop + (Keersop, bron: https://www.dommel.nl/algemeen/actueel/werk-in-uitvoering/valkenswaard/beekherstel-keersop.html)
- Case study:Kelham Island Weir Fish Easement + (Kelham Island Weir)
- Case study:Kensworth Quarry Chalk Pit Restoration + (Kensworth Quarry)
- Case study:Water Framework Directive Funding + (Kington - Arrowmills)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Kjøsnesbekken was built with gravel (photo: Arne Jørgen))
- Case study:Knock Burn low flow channel + (Knock Burn low flow channel post works)
- Case study:Restoration of Kocksbybäcken brook + (Kocksbybäcken brook after restoration (photo:Liisa Hämäläinen))
- Case study:Traditioneel Beekherstel Koffiegoot + (Koffiegoot)
- Case study:Kuuskoski-Fishway + (Kuuskoski fishway (photo:Pasi Lempinen))
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (LIFE Charcos)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (LIFE GREENCHANGE (LIFE17 NAT/IT/000619))
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (LIFE GREENCHANGE (LIFE17 NAT/IT/000619))
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (LIFE REWETLAND (LIFE+08 env/it/000406))
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (LIFE RISORGIVE)
- Case study:LIFE RISORGIVE – Roggia Girosa + (LIFE RISORGIVE)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (LIFE RISORGIVE)
- Case study:Ladywell Fields (QUERCUS) + (Ladywell Fields after restoration)
- Case study:QUERCUS Ravensbourne + (Ladywell Fields, created backwater, August 2008)
- Case study:Sutcliffe Park + (Lake at Sutcliffe Park)
- Case study:River Nar Restoration Project + (Large woody debris - River Nar, West Acre)
- Case study:Stroud Rural Sustainable Drainage Project + (Large woody debris in Painswick stream - Beech tree trunk to attenuate flows and create diverse in-stream habitat)
- Case study:Borrowash fish pass + (Larinier fish pass at Borrowash complete (image courtesy of J.Finnegan, the Environment Agency))
- Case study:Beekherstel Leerinkbeek + (Leerinkbeek)
- Case study:Albany Park + (Left: pre-restoration concrete channel Right: post-restoration sinuous, natural channel.)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Leighton Moss: habitats, wildlife, and problems)
- Case study:Hierdense Beek + (Leuvenumse beek – dood hout brengt beek tot leven)
- Case study:River Little Ouse at Thetford + (Little Ouse following restoration)
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck + (Livestock poaching river banks and inputting faecal matter into a small tributary of Skirden)
- Case study:Telford Catchment Restoration Project + (Location Map)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Location of the project (GN - Scan25))
- Case study:Long Eau (Great Eau) + (Long Eau floodplain 2005)
- Case study:Restoration of Longinoja brook + (Longinoja after restauration_may 2006 (photo: Liisa Laitinen))
- Case study:River Restoration at Hunworth (River Glaven) + (Looking downstream from the dismantled railway)
- Case study:Burn of Balmaleedy Restoration, Marykirk + (Looking downstream on restored section of the Burn of Balmaleedy)