Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Witham around Grantham + (Grange farm stage zero)
- Case study:River Pinn Enhancement near Ickenham + (Gravel being added to the channel)
- Case study:Moreton Channel Gravel Reprofiling + (Gravel reprofiling work in progress. Courtesy of Alasdair Maxwell - Environment Agency.)
- Case study:River restoration on the River Brett at Shelley + (Gravel shoulders created using material excavated from a newly created pool. Note how the flow is visibly quicker where the channel is constricted by the gravel features.)
- Case study:Grovelands Park Wetlands + (Grovelands Park Wetlands, summer 2015)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Grönkullen stream (photo. Maria Arola))
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Gueltas - Etangs de la foret de Branguilly (Source: Althis, 2008))
- Case study:Gunnerside Gill: Abandoned metal mines + (Gunnerside Gill with steep spoil tips at Dolly Mine)
- Case study:Gunville Phase I + (Gunville Phase I)
- Case study:HPP Blanca + (HPP Blanca and the fishway on the right part of the dam (http://www.he-ss.si/pdf/he_blanca-primer_dobre_prakse.pdf). .)
- Case study:Wandle River Restoration Project: Hackbridge + (Hackbridge Restoration © Wandle Trust)
- Case study:Hainburg River Restoration + (Hainburg River Restoration, courtesy of Donau-Auen National Park)
- Case study:Haltwhistle burn; a total catchment approach + (Haltwhistle catchment; beautiful and challenging)
- Case study:Hampton Court Palace + (Hampton Court from the River Thames. (Philip Carey 2010))
- Case study:Hills to Levels + (Hills to Levels Logo)
- Case study:Papermill Weir Section in-channel restoration + (Hinged Trees following works)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (Hogsmill River Before works)
- Case study:River Hogsmill Restoration Project + (Hogsmill in flood just following works)
- Case study:The Holbina-Dunavat Restoration Project + (Holbina area (source: www.info-delta.ro))
- Case study:Reopening and restoration of the stream Hovinbekken + (Hovinbekken at Bjerkedalen Park 2017. Photo: Therese Fosholt Moe / Norwegian Institute for Water Research (NIVA))
- Case study:Restoration of Ilabekken brook + (Ilabekken after restoration 2012 (photo by Morten Bergan))
- Case study:Harbertonford Flood Alleviation Scheme + (Illustration of proposed works. Courtesy of Bradley et al.(Available at http://www.britishdams.org/2004conf/papers/bradley.PDF).)
- Case study:Western Rother Fishery Habitat Enhancement + (Image of the Rother pre-restoration)
- Case study:La Gotera dam removal + (Image of the removal works of La Gotera dam. Photo Credits: Ministry of Agriculture and Fishing, Food and Environment (MAPAMA).)
- Case study:Southington River Restoration Project + (Image showing location of removed structure and newly improved surrounding area)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Improvement works)
- Case study:Houghton 'trout stream' enhancements + (Installation of a mid-channel 'v' deflector to create and maintain clean gravels)
- Case study:Fairham Brook Restoration Project + (Installation of coir rolls at Gotham)
- Case study:River Calder Large Wood Structure installation + (Installing LWS at the upstream end of the project reach.)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Interreg Med Wetnet)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Interreg Med Wetnet)
- Case study:Restoration of Juottimenoja Brook + (Juottimenoja after restoration (photo: Liisa Laitinen).jpg)
- Case study:Beekherstel Keersop + (Keersop, bron: https://www.dommel.nl/algemeen/actueel/werk-in-uitvoering/valkenswaard/beekherstel-keersop.html)
- Case study:Kelham Island Weir Fish Easement + (Kelham Island Weir)
- Case study:Kensworth Quarry Chalk Pit Restoration + (Kensworth Quarry)
- Case study:Water Framework Directive Funding + (Kington - Arrowmills)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Kjøsnesbekken was built with gravel (photo: Arne Jørgen))
- Case study:Knock Burn low flow channel + (Knock Burn low flow channel post works)
- Case study:Restoration of Kocksbybäcken brook + (Kocksbybäcken brook after restoration (photo:Liisa Hämäläinen))
- Case study:Traditioneel Beekherstel Koffiegoot + (Koffiegoot)
- Case study:Kuuskoski-Fishway + (Kuuskoski fishway (photo:Pasi Lempinen))
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (LIFE Charcos)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (LIFE GREENCHANGE (LIFE17 NAT/IT/000619))
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (LIFE GREENCHANGE (LIFE17 NAT/IT/000619))
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (LIFE REWETLAND (LIFE+08 env/it/000406))
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (LIFE RISORGIVE)
- Case study:LIFE RISORGIVE – Roggia Girosa + (LIFE RISORGIVE)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (LIFE RISORGIVE)
- Case study:Ladywell Fields (QUERCUS) + (Ladywell Fields after restoration)
- Case study:QUERCUS Ravensbourne + (Ladywell Fields, created backwater, August 2008)
- Case study:Sutcliffe Park + (Lake at Sutcliffe Park)
- Case study:River Nar Restoration Project + (Large woody debris - River Nar, West Acre)