Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Beneden-Leeuwen-Side channel + (Ecological benefits of side channels presentation, M. Schoor (2010))
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Ecoremediation (ERM) system for treatment of the polluted tributary of Glinščica (Photo: S. Blumauer))
- Case study:Eddleston water + (Eddleston Water catchment restoration, photograph source: Tweed Forum)
- Case study:Weir upstream of Redbridge roundabout + (Eel trap monitoring before the project)
- Case study:Eldbäcken + (Eldbäcken, biokanal (photo by Olle Calles))
- Case study:Soaring connections: restoring people, wildlife & place + (Ellis Meadows wetland)
- Case study:River Avon Our Water Environment + (Engineered woody structure along river bank at Fordmouth Farm - soil scrapped back & 8m long tree trunks, with intact root plates towards river, located along bank prior to burying)
- Case study:Restoration of Enningdalsälv River + (Enningdalsälv River_after restoration (photo: Langevallsalven))
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (Eroding banks and grazing on the Stock Beck)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (Example of bank protection used)
- Case study:Lullingstone Castle phase 2 + (Example of first phase works)
- Case study:RSPB Fowlmere Nature Reserve + (Faggots on the restored Fowlmere)
- Case study:Thackthwaite catchment restoration + (Failing constructed flood levee)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Fairfield Community project: New pond and cattle fenced out of wetlands)
- Case study:Eden Crayfish Restoration Project + (Fencing and tree planting along the River Lyvennet, a tributary of the River Eden in Cumbria)
- Case study:Avon Barriers Project + (Fernegair Weir)
- Case study:Avon Barriers Project: Ferengair Weir + (Fernegair Weir)
- Case study:MediCyn + (Filling of one of the temporary marshes in August by pumping)
- Case study:Beneden-Berkel + (Fishpass on the Beneden-Berkel project (courtesy of Waterschap Rijn & IJssel))
- Case study:Goresbrook Park + (Flowering field with a dancing and dipping row of willow trees)
- Case study:Bakenhof Dyke reconstruction + (Following realignment of the dyke)
- Case study:River Ebbw Bank Stabilisation + (Following restoration)
- Case study:The Fortuna Restoration Project + (Fortuna lake (source: www.infoturism.ro))
- Case study:Gilev's Grove reconstruction + (General scheme of the Gilev's Grove)
- Case study:Test and Itchen Invasive Non-Native Project Species Project + (Generic picture of the impact of INNS)
- Case study:Afon Merin Natural Process Restoration + (Generic site pic)
- Case study:Gottar Water weir fish barrier easement + (Gottar water weir)
- Case study:River Witham around Grantham + (Grange farm stage zero)
- Case study:River Pinn Enhancement near Ickenham + (Gravel being added to the channel)
- Case study:Moreton Channel Gravel Reprofiling + (Gravel reprofiling work in progress. Courtesy of Alasdair Maxwell - Environment Agency.)
- Case study:River restoration on the River Brett at Shelley + (Gravel shoulders created using material excavated from a newly created pool. Note how the flow is visibly quicker where the channel is constricted by the gravel features.)
- Case study:Grovelands Park Wetlands + (Grovelands Park Wetlands, summer 2015)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Grönkullen stream (photo. Maria Arola))
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Gueltas - Etangs de la foret de Branguilly (Source: Althis, 2008))
- Case study:Gunnerside Gill: Abandoned metal mines + (Gunnerside Gill with steep spoil tips at Dolly Mine)
- Case study:Gunville Phase I + (Gunville Phase I)
- Case study:HPP Blanca + (HPP Blanca and the fishway on the right part of the dam (http://www.he-ss.si/pdf/he_blanca-primer_dobre_prakse.pdf). .)
- Case study:Wandle River Restoration Project: Hackbridge + (Hackbridge Restoration © Wandle Trust)
- Case study:Hainburg River Restoration + (Hainburg River Restoration, courtesy of Donau-Auen National Park)
- Case study:Haltwhistle burn; a total catchment approach + (Haltwhistle catchment; beautiful and challenging)
- Case study:Hampton Court Palace + (Hampton Court from the River Thames. (Philip Carey 2010))
- Case study:Hills to Levels + (Hills to Levels Logo)
- Case study:Papermill Weir Section in-channel restoration + (Hinged Trees following works)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (Hogsmill River Before works)
- Case study:River Hogsmill Restoration Project + (Hogsmill in flood just following works)
- Case study:The Holbina-Dunavat Restoration Project + (Holbina area (source: www.info-delta.ro))
- Case study:Reopening and restoration of the stream Hovinbekken + (Hovinbekken at Bjerkedalen Park 2017. Photo: Therese Fosholt Moe / Norwegian Institute for Water Research (NIVA))
- Case study:Restoration of Ilabekken brook + (Ilabekken after restoration 2012 (photo by Morten Bergan))
- Case study:Harbertonford Flood Alleviation Scheme + (Illustration of proposed works. Courtesy of Bradley et al.(Available at http://www.britishdams.org/2004conf/papers/bradley.PDF).)
- Case study:Western Rother Fishery Habitat Enhancement + (Image of the Rother pre-restoration)
- Case study:La Gotera dam removal + (Image of the removal works of La Gotera dam. Photo Credits: Ministry of Agriculture and Fishing, Food and Environment (MAPAMA).)