Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Syston and Barkston Restoration + (Channel narrowing and flow deflectors)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Channel post restoration works)
- Case study:River Quaggy- Chinbrook meadows + (Chinbrook Meadows soon after the works had been completed)
- Case study:The Ciobarciu Wetland Project + (Ciobarciu Wetland - present situation)
- Case study:Old Station Beat restoration, River Test at Bossington + (Clean gravels and excellent spawning habitat after channel narrowing ©RRC June 2014)
- Case study:MisbourneRiverAction + (Clearing The Mill Leat at Chalfont St Giles)
- Case study:Clitherow's Island, Brentford eel pass + (Clitherow Island Eel Pass)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Completed project (Environment Agency, River Stour report doc, 2011))
- Case study:Hedleyhope Burn + (Completed rock ramp easement. Photograph courtesy of the Wear Rivers Trust)
- Case study:Biomura LIFE06NAT/SI/000066 + (Conservation of biodiversity of the Mura River in Slovenia (http://www.biomura.si/prenosi/casopis%20Biomura/BioMura_zgibanka1_ang.pdf))
- Case study:Aubourn Rock Ramp and Habitat Works + (Constructed Rock Ramp.)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Constructed new strem channel (photo. Maria Arola))
- Case study:Sediment Pathways Project + (Constructing cross drain on farm track)
- Case study:The River Deerness Project + (Cornsay Colliery culvert)
- Case study:River Gelsa at Bevtoft + (Courtesy of Google Street Map, 2013.)
- Case study:Creamery Weir fish barrier easement + (Creamery Weir before removal)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Creation of stagnant and semi-stagnant lagoons along the Scarpe. Summer 2010. (Communauté urbaine d’Arras))
- Case study:River Alt at Knowsley + (Cross section of new floodplain and braided channels)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Cross section of the project (Source: Graphies).)
- Case study:Deculverting Holtan stream + (Culverted Holtan stream 13th May 2020. Picture: Miguel A. Segarra Valls)
- Case study:Broadway Fields/ Seagers Distillary + (Current state)
- Case study:Day Brook Rain Gardens + (Day Brook rain garden)
- Case study:Beekherstel Eefsebeek + (De oude Eefsebeek)
- Case study:Lunterse Beek + (De oude Lunterse beek)
- Case study:Washwalk Wetland + (December 2023, photo of slow moving water during flash flooding)
- Case study:Norman Park Bromley. + (Deculverting)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (Deflectors used to improve the flow of the river)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Diagram showing the works done in the town of Jassans-Riottier. (Voies navigables de France).)
- Case study:The Red River: Abandoned Metal Mines + (Dolcoath Mine circa. 1890)
- Case study:Restoring the River Doquette to its original bed + (Doquette)
- Case study:LIFE IP IRIS Enns Mandling Restoration + (During Construction in 2023)
- Case study:East Mascalls Fish Pass + (East Mascalls Fish Pass In-Situ)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Eau Blanche at Nismes: meandering channel (one year post completion))
- Case study:Beneden-Leeuwen-Side channel + (Ecological benefits of side channels presentation, M. Schoor (2010))
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Ecoremediation (ERM) system for treatment of the polluted tributary of Glinščica (Photo: S. Blumauer))
- Case study:Eddleston water + (Eddleston Water catchment restoration, photograph source: Tweed Forum)
- Case study:Weir upstream of Redbridge roundabout + (Eel trap monitoring before the project)
- Case study:Eldbäcken + (Eldbäcken, biokanal (photo by Olle Calles))
- Case study:Soaring connections: restoring people, wildlife & place + (Ellis Meadows wetland)
- Case study:River Avon Our Water Environment + (Engineered woody structure along river bank at Fordmouth Farm - soil scrapped back & 8m long tree trunks, with intact root plates towards river, located along bank prior to burying)
- Case study:Restoration of Enningdalsälv River + (Enningdalsälv River_after restoration (photo: Langevallsalven))
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (Eroding banks and grazing on the Stock Beck)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (Example of bank protection used)
- Case study:Lullingstone Castle phase 2 + (Example of first phase works)
- Case study:RSPB Fowlmere Nature Reserve + (Faggots on the restored Fowlmere)
- Case study:Thackthwaite catchment restoration + (Failing constructed flood levee)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Fairfield Community project: New pond and cattle fenced out of wetlands)
- Case study:Eden Crayfish Restoration Project + (Fencing and tree planting along the River Lyvennet, a tributary of the River Eden in Cumbria)
- Case study:Avon Barriers Project + (Fernegair Weir)
- Case study:Avon Barriers Project: Ferengair Weir + (Fernegair Weir)
- Case study:MediCyn + (Filling of one of the temporary marshes in August by pumping)