Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Cleddau + (Bank section after works 2005 (courtesy of Salix Water & Wetland Services Ltd))
- Case study:Lower River Roding Regeneration Project + (Barking Barrier)
- Case study:Barney Beck: Abandoned Metal Mines + (Barney Beck with steep spoil tips at Old Gang)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Barrier to fish migration - Higher Chipping House, River Loud)
- Case study:Tall River + (Bay 2 and stone cascade - 2006)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Beckfoot crossing - Barbon Beck - New over-deepened box culvert)
- Case study:Holmsley Inclosure Stream Restoration + (Bed level raising in progress)
- Case study:River Wandle: Butter Hill Phase 3 + (Before & After Butter Hill Phase 3 Works © Wandle Trust)
- Case study:Restoration of the Erft-river in Weilerswist + (Before (left) and after (right) restoration)
- Case study:Butter Hill Phase 2 + (Before and After of Restoration Works © Wandle Trust)
- Case study:Goshen Weir removal project, River Roch, Bury + (Before and after removal (Goshan Weir))
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Before and after restoration)
- Case study:Abbey Brook Weir + (Before and after weir removal on the Abbey brook)
- Case study:Clugston Burn (CASS) + (Before and after works)
- Case study:Belton Floodplain Reconnection and River Restoration + (Belton wet floodplain winter 23/24.)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Berm Construction to Create Sinuosity)
- Case study:Beekherstel Beekloop BmN + (Bestaande situatie (rode lijn betreft het projectgebied, met zwart is aangegeven waar werkzaamheden zijn gepland), bron: http://edepot.wur.nl/396172)
- Case study:Tungelroyse beek + (Birds eye view of the Tungelroysebeek after completion (source: Waterschap Peels en Maasvallei))
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Borrowdale Moss (Forest Hall) - Re-profiled peat hags)
- Case study:Bowston Weir Removal + (Bowston weir removal)
- Case study:Braid Burn at Inch Park + (Braid Burn flooding, Inch Park, March 2010)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Breakout near Rispey mine)
- Case study:Philips Park + (Brick lined channel through the park)
- Case study:Herinrichting Beekloop + (Bron: http://edepot.wur.nl/396172)
- Case study:The South Cornwall River Improvement Project - St. Austell + (Brown Trout from the Portmellon stream)
- Case study:Little Ponton + (Brushwood mattress in restoration section)
- Case study:Bures Mill fish by-pass + (Bures Mill fish by-pass)
- Case study:Burn of Mosset, Forres + (Burn of Mosset- sustainable sediment and flood management by reconnecting the river with its floodplain and working with natural processes)
- Case study:Beekherstel Buurserbeek + (Buurserbeek)
- Case study:River Witham Great Ponton + (By-pass channel under construction.)
- Case study:Beekherstel Zuidelijk Afwateringskanaal + (Capelle Sluisbrug over het Zuidelijke Afwateringskanaal)
- Case study:River Wandle Restoration Project + (Carshalton Arm Restoration, © Wandle Trust)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Cassaire site two years after the beginning of the hydraulic management.)
- Case study:QUERCUS Dee + (Castle Drive Improvements, Spring 2008)
- Case study:Mulkear Life Project + (Catchment map for the Mulkear River and tributaries. Courtesy of the Shannon Regional Fisheries Board.)
- Case study:Černý potok stream restoration scheme + (Central part of the stream restoration)
- Case study:Syston and Barkston Restoration + (Channel narrowing and flow deflectors)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Channel post restoration works)
- Case study:River Quaggy- Chinbrook meadows + (Chinbrook Meadows soon after the works had been completed)
- Case study:The Ciobarciu Wetland Project + (Ciobarciu Wetland - present situation)
- Case study:Old Station Beat restoration, River Test at Bossington + (Clean gravels and excellent spawning habitat after channel narrowing ©RRC June 2014)
- Case study:MisbourneRiverAction + (Clearing The Mill Leat at Chalfont St Giles)
- Case study:Clitherow's Island, Brentford eel pass + (Clitherow Island Eel Pass)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Completed project (Environment Agency, River Stour report doc, 2011))
- Case study:Hedleyhope Burn + (Completed rock ramp easement. Photograph courtesy of the Wear Rivers Trust)
- Case study:Biomura LIFE06NAT/SI/000066 + (Conservation of biodiversity of the Mura River in Slovenia (http://www.biomura.si/prenosi/casopis%20Biomura/BioMura_zgibanka1_ang.pdf))
- Case study:Aubourn Rock Ramp and Habitat Works + (Constructed Rock Ramp.)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Constructed new strem channel (photo. Maria Arola))
- Case study:Sediment Pathways Project + (Constructing cross drain on farm track)
- Case study:The River Deerness Project + (Cornsay Colliery culvert)
- Case study:River Gelsa at Bevtoft + (Courtesy of Google Street Map, 2013.)