Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Flood detention basin (HRB) Ickern-Mengede + (Aerial view of the HRB Ickern-Mengede during construction)
- Case study:River Skerne- Life project + (Aerial view of the completed Skerne works)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (After - restored meandering channel ©Environment Agency)
- Case study:Newe Fish Pass Improvements project + (After improvement project, photograph courtesy of The River Don Trust)
- Case study:Massadammen-dam removal in River Tabergsån + (After restoration (photo. Maria Arola))
- Case study:Restoration of Reinikkalankoski torrent + (After restoration (photo. Markus Tapaninen))
- Case study:Restoration of Vantaanjoki River + (After restoration (photo: Olli Toivonen))
- Case study:Sågarsfors + (After restoration. Photo by Esa Lehtinen)
- Case study:Manor Road Park + (After the restoration)
- Case study:Alkborough tidal defence scheme + (Alkborough area)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Alternating berms on the River Waveney at Bressingham)
- Case study:Amerongse Bovenpolder + (Amerongse Bovenpolder seen from its northern edge, looking south.)
- Case study:River restoration and flood alleviation on the River Brain at Witham + (An interpretation board for the Whetmead Local Nature Reserve)
- Case study:Force Crag Mine Remediation + (April 2014. Completed Force Crag mine water treatment scheme. Photo by John Malley.)
- Case study:National Park Danube-Auen + (Aquatic habitat near Lobau)
- Case study:Historic Mill Restoration Project + (Area of the project)
- Case study:Downham Playing Fields + (Area of the project)
- Case study:Opijnen- Side channel + (Arial photo courtesy of Rijkswaterstaat)
- Case study:Alma Road Rain Gardens + (Artists Impression)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Austwick Beck - new fencing protecting bank)
- Case study:River Avon Stream project + (Avon at Amesbury, post-restoration works in 2009)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Avon tyrell post works)
- Case study:Babbs Mill reed bed + (Babbs Mill lake reedbed via Google satellite image)
- Case study:Babingley River at Hillington + (Babingley River at Hillington)
- Case study:Millfield Plantation 2 + (Back Channel to be restored, River Pant in the foreground)
- Case study:River Nene Nature Improvement Area + (Backwater created on the River Ise (Rushton Loop))
- Case study:River Cleddau + (Bank section after works 2005 (courtesy of Salix Water & Wetland Services Ltd))
- Case study:Lower River Roding Regeneration Project + (Barking Barrier)
- Case study:Barney Beck: Abandoned Metal Mines + (Barney Beck with steep spoil tips at Old Gang)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Barrier to fish migration - Higher Chipping House, River Loud)
- Case study:Tall River + (Bay 2 and stone cascade - 2006)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Beckfoot crossing - Barbon Beck - New over-deepened box culvert)
- Case study:Holmsley Inclosure Stream Restoration + (Bed level raising in progress)
- Case study:River Wandle: Butter Hill Phase 3 + (Before & After Butter Hill Phase 3 Works © Wandle Trust)
- Case study:Restoration of the Erft-river in Weilerswist + (Before (left) and after (right) restoration)
- Case study:Butter Hill Phase 2 + (Before and After of Restoration Works © Wandle Trust)
- Case study:Goshen Weir removal project, River Roch, Bury + (Before and after removal (Goshan Weir))
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Before and after restoration)
- Case study:Abbey Brook Weir + (Before and after weir removal on the Abbey brook)
- Case study:Clugston Burn (CASS) + (Before and after works)
- Case study:Belton Floodplain Reconnection and River Restoration + (Belton wet floodplain winter 23/24.)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Berm Construction to Create Sinuosity)
- Case study:Beekherstel Beekloop BmN + (Bestaande situatie (rode lijn betreft het projectgebied, met zwart is aangegeven waar werkzaamheden zijn gepland), bron: http://edepot.wur.nl/396172)
- Case study:Tungelroyse beek + (Birds eye view of the Tungelroysebeek after completion (source: Waterschap Peels en Maasvallei))