Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + ("Dolna topchia" Reserve)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + ("Zlato Pole" Protected Area)
- Case study:Bow Brook Living Landscape + (100m backwater channel (Sept 2013))
- Case study:TEST Daylighting the Texas Valley stream + (2. Newly restored stretch of stream Texas Valley, one year after implementation of restoration measures, i.e. March 2017. Photo: Kari Nordkvinne/NIVA.)
- Case study:DUMMY TEST Daylighting Sorum + (2. The Texas Valley stream one year after daylighting. July 26th 2017. Photo: Kari Nordkvinne/NIVA.)
- Case study:TEST Deculverting the Texas Valley Stream 1 + (2. The Texas Valley stream one year after daylighting. July 26th 2017. Photo: Kari Nordkvinne/NIVA.)
- Case study:Test and Itchen River Restoration Strategy + (A River Restoration Centre Members site visit (June 2014) where Test and Itchen Project Officer, Heb Leman (Environment Agency), explained the aims of the restoration strategy. Photo © RRC)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (A culvert and a weir on the Kirklees Brook)
- Case study:Restoration of the previous riverbed of the Dadon + (A few months after restoration)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (A flow deflector installed on the River Brett upstream of Shelley Bridge)
- Case study:Rams Brewery + (A graphic of the proposed scheme)
- Case study:Chambers Wharf + (A graphic of what Chambers Wharf will look like)
- Case study:Enhancement of the River Crouch following a pollution incident + (A gravel bar formed at the confluence of the River Crouch and Runwell Brook)
- Case study:Fishery/habitat enhancement on the Grand Union Canal + (A new backwater)
- Case study:Water Quality Restoration River Dun- Canal Bypass Weirs + (A new bypass weir (Canal and Rivers Trust))
- Case study:Restoration of the river Børselva + (A newly opened (macrophyte removal) section of Børselva, including sedimentation pond (far left) and consecutive constructed wetlands. Source: Aanes et al 2016 (NIVA report 6900-2015))
- Case study:Chinbrook Meadows Wetlands + (A picture taken in May 2024 of two of the four wetland cells)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (A redundant gauging station before works started)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (A view of Rio San Martino in one of the restored portions)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (A weir after restoration of the river bed.)
- Case study:Abbotts Hall Managed Realignment Scheme + (Abbots Hall)
- Case study:Brook Ramlösa-Restoration of agricultural stream + (Added sinuosity to the stream (photo. Outi Laamanen))
- Case study:Sharnberry Mine: Abandoned Metal Mines + (Adit at Sharnberry mine)
- Case study:LIFE+ Traisen + (Aerial image of the LIFE+ Traisen project area)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (Aerial view of remeandered River Leith at Thrimby, Penrith, Cumbria)
- Flood detention basin (HRB) Ickern-Mengede + (Aerial view of the HRB Ickern-Mengede during construction)
- Case study:River Skerne- Life project + (Aerial view of the completed Skerne works)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (After - restored meandering channel ©Environment Agency)
- Case study:Newe Fish Pass Improvements project + (After improvement project, photograph courtesy of The River Don Trust)
- Case study:Massadammen-dam removal in River Tabergsån + (After restoration (photo. Maria Arola))
- Case study:Restoration of Reinikkalankoski torrent + (After restoration (photo. Markus Tapaninen))
- Case study:Restoration of Vantaanjoki River + (After restoration (photo: Olli Toivonen))
- Case study:Sågarsfors + (After restoration. Photo by Esa Lehtinen)
- Case study:Manor Road Park + (After the restoration)
- Case study:Alkborough tidal defence scheme + (Alkborough area)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Alternating berms on the River Waveney at Bressingham)
- Case study:Amerongse Bovenpolder + (Amerongse Bovenpolder seen from its northern edge, looking south.)
- Case study:River restoration and flood alleviation on the River Brain at Witham + (An interpretation board for the Whetmead Local Nature Reserve)
- Case study:Force Crag Mine Remediation + (April 2014. Completed Force Crag mine water treatment scheme. Photo by John Malley.)
- Case study:National Park Danube-Auen + (Aquatic habitat near Lobau)
- Case study:Historic Mill Restoration Project + (Area of the project)
- Case study:Downham Playing Fields + (Area of the project)
- Case study:Opijnen- Side channel + (Arial photo courtesy of Rijkswaterstaat)
- Case study:Alma Road Rain Gardens + (Artists Impression)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Austwick Beck - new fencing protecting bank)
- Case study:River Avon Stream project + (Avon at Amesbury, post-restoration works in 2009)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Avon tyrell post works)
- Case study:Babbs Mill reed bed + (Babbs Mill lake reedbed via Google satellite image)
- Case study:Babingley River at Hillington + (Babingley River at Hillington)
- Case study:Millfield Plantation 2 + (Back Channel to be restored, River Pant in the foreground)