Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of habitats in Pärnu river + (22716)
- Case study:R Derwent Abutment & Buttress Removal + (22755)
- Case study:Reopening the River Roch in Rochdale and Reducing Flood Risk + (22772)
- Case study:Monty Rivers Project + (22787)
- Case study:Friends of Bottesford Beck + (22803)
- Case study:Soaring connections: restoring people, wildlife & place + (22805)
- Case study:Castle Irwell Urban Wetland + (22824)
- Case study:Healthy Rivers + (22831)
- Case study:Looe Bathing Waters Project + (22832)
- Case study:East Tullos Burn Environment Improvements Project + (22839)
- Case study:River Eye + (23110)
- Case study:Restoration of connectivity and Enrichment in the substrate of poor spawning areas + (23119)
- Case study:Hull and East Riding Catchment Partnership + (23142)
- Case study:Tichborne River Restoration Project + (23166)
- Case study:Creation of a Constructed Farm Wetland + (23168)
- Case study:CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA + (23172)
- Case study:Hills to Levels + (23176)
- Case study:Southington River Restoration Project + (23183)
- Case study:Taming the Tame + (23184)
- Case study:Community Wetlands + (23187)
- Case study:Wildling the Tame + (23188)
- Case study:Connswater Community Greenway + (23195)
- Case study:Kelham Island Weir Fish Easement + (23200)
- Case study:Brightside Weir Fish Pass + (23202)
- Case study:Lady's Bridge Fish Easement + (23204)
- Case study:Steelbank Weir Fishpass + (23206)
- Case study:Norfolk Bridge Weir Fish Easement + (23208)
- Case study:Little Don Catchment Case Study + (23212)
- Case study:Letting the Dove Flow 2 + (23240)
- Case study:River Trent, Bucknall Park + (23267)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (23328)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (23333)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (23338)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (23343)
- Case study:Restoration of the river continuity on the Touques Basin + (23349)
- Case study:Reopening of the culverted Redon river + (23353)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (23359)
- Case study:Restoration of side channels of the Loire and its tributaries + (23366)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (23372)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (23378)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (23384)
- Case study:The San Marcos weir removal + (23390)
- Case study:Inturia dam removal + (23393)
- Case study:Robledo de Chavela dam removal + (23395)
- Case study:La Gotera dam removal + (23397)
- Case study:Fish pass on the Najerilla River + (23400)
- Case study:Fish pass in Las Librerías weir on the Guadiela River + (23402)
- Case study:Restoring the natural dynamics of the upper Adour + (23404)
- Case study:Creating a fishpass at Włocławek dam + (23407)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (23416)
- Case study:Experimental flood in the Pisuerga river + (23426)