Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (21675)
- Case study:MisbourneRiverAction + (21706)
- Case study:River Meden response to diffuse pollution + (21721)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (21724)
- Case study:Ecclesbourne Farm project + (21725)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (21727)
- Case study:River Soar fish refuge and wetland scrape + (21731)
- Case study:Fairham Brook Restoration Project + (21738)
- Case study:River Soar Floating Pennywort Eradication + (21745)
- Case study:River Idle Restoration Project + (21752)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (21771)
- Case study:Tahlequah History Trail - Illinois River Restoration Project + (21786)
- Case study:River Ranch-Illinois River Restoration Project + (21787)
- Case study:Tahlequah Sequoyah Park - Illinois River Restoration Project + (21791)
- Case study:Tahlequah Felts Park- Illlinois River Restoration Project + (21793)
- Case study:Tahlequah Kaufman Park + (21794)
- Case study:Illinios River-Private Property1 + (21796)
- Case study:Illinois River- Private Property2 + (21797)
- Case study:Tahlequah- Peavine Hollow + (21798)
- Case study:Illinois River- Private Property 3 + (21799)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (21801)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (21802)
- Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 + (21803)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (21804)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (21805)
- Case study:Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) + (21806)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (21807)
- Case study:Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) + (21808)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (21809)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (21810)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (21811)
- Case study:Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 + (21812)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (21814)
- Case study:Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg + (21815)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (21816)
- Case study:Austria Urban River Landscape - Urban River Landscape Master Plan Leoben + (21817)
- Case study:Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission + (21818)
- Case study:Matanza-Riachuelo + (21819)
- Case study:Bocq river (Walphy - LIFE project) + (21869)
- Case study:Eau Blanche River (Walphy - LIFE project) + (21885)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (21900)
- Case study:Dunston Beck Restoration + (21926)
- Case study:Tottenham Lock Floating Ecosystem + (21944)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (21952)
- Case study:Restoration of R. Odelouca + (21963)
- Case study:Restoration of R. Odelouca 2 + (21964)
- Case study:ReNaturalize + (21966)
- Case study:Strategic redistribution of channel substrate + (22012)
- Case study:Segura's River Bioremediation + (22024)
- Case study:Wellow Brook Habitat Enhancement Project + (22029)
- Case study:Longford Community Nature Park Reedbed Restoration Project + (22042)