Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:DUMMY TEST Daylighting Sorum + (construction of recreational facilities (trails and footbridges))
- Case study:TEST Daylighting the Texas Valley stream + (construction of recreational facilities (trails and footbridges))
- Case study:TEST Deculverting the Texas Valley Stream + (construction of recreational facilities (trails and footbridges))
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Landscaping and cleaning of the area (rubble removal)
- Case study:Hills to Levels + (Run-off interception)
- Case study:Delivering Multiple Benefits for Water on Foston Brook + (Hardened crossing points)
- Case study:Isar-Plan + (embedding of rootballs and tree trunks)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Improve and adapt existing sanitation infrastructure)
- Case study:Watercress Farm Rewetting Project + (Ecosulis advocated for a modification to the pond's design)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Cattle drinks)
- Case study:Chambers Wharf + (green roofs)
- Case study:Rams Brewery + (green roofs)
- Case study:Watercress Farm Rewetting Project + (Ecosulis advocated for a modification to the pond's design)
- Case study:Tungelroyse beek + (Fish by-pass channel)
- Case study:Bristol Frome Diffuse Pollution Project + (Agricultural/Farming improvements)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (recreational use (construction of footpaths)
- Case study:Camargue’s former saltworks + (Reconnection between the sea and the lagoons)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (meintenance of the trails network)
- Case study:Glenbrook Wetlands + (n/a)
- Case study:Isar-Plan + (embedding of rootballs and tree trunks)
- Case study:Chambers Wharf + (roosting posts)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Natural water purification systems; Creation of a good system of access points)
- Case study:Salzano wetland and Marzenego river restoration project + (re-establish rare and endangered aquatic vegetation types)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (General cleaning of the area)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Landscaping and cleaning of the area (rubble removal)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Melides Lagoon Wastewater System; Melides Camping Site Wastewater Treatment; Reducing debris deposition in the Lagoon; Creation of infrastructure for nature tourism and environmental education on the banks of the lagoon and surrounding areas (walkways)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Creation of facilities for the visit and educational use of the area)
- Case study:Wyre Riparian Restoration Initiative + (Soft engineering methods)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Fences)
- Case study:Gilev's Grove reconstruction + (two new bridges were constructed over a brook)
- Case study:Logie Burn Restoration Project + (The meanders were cleared of sediment)
- Case study:Goldrill Beck River Restoration + (wet woodland restoration through channel blocking)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (building of tourist infrastructure)