Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Černý potok stream restoration scheme + (Recovering natural landscapes)
- Case study:Soaring connections: restoring people, wildlife & place + (Recovering natural landscapes)
- Case study:West Allen: Abandoned Metal Mines + (Reduce pollution risk)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Rehabilitation and valorisation of the Coj … Rehabilitation and valorisation of the Cojillas tidal mill; Connection project and use of livestock tracks and rural roads as green corridor; Enhancement of the connection marsh-city in front of 26 de Abril de 1963 square and estuary promenade; Project for the connection and use of livestock tracks and rural roads as green corridors (Odiel river border to the hanging bridge of a-49); Enhancement of the marsh-city connection in front of the San Felice de Circeo promenade and the surroundings of the Tejar streame and the surroundings of the Tejar stream)
- Case study:Timber float restorations at River Iijoki + (Rehabilitation of water levels in nearby lakes)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Removal of a flap valve)
- Case study:Platt Brook Restoration + (Removal of accumulated debris and silt.)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of fallen trees)
- Case study:River Mease Waterside Care + (Removal of invasive plants)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Removal of rubbish)
- Case study:Friends of Bottesford Beck + (Removal of rubbish)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Remove the old small bridge)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Reparation of sluice gates)
- Case study:Rehabilitation of Benta stream + (Reparation of sluice gates)
- Case study:River Marden at Calne + (Replacement existing culvert with twin culvert)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Restoration of rubble walls)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (Reintroducing salmon population to the river)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Restoring the natural hydrological regime)
- Case study:River Skerne- Life project + (Creation of new bicycle path)
- Case study:Hills to Levels + (Run-off interception)
- Case study:Brackenhurst Natural Flood Management + (Runoff pathway management)
- Case study:Afon Clywdd + (Runoff pathway management)
- Case study:Nant Barrog + (Runoff pathway management)
- Case study:Debenham Flood Storage Options - flood modelling and economic assessment + (Runoff pathway management)
- Case study:Evenlode Catchment Project + (Runoff pathway management)
- Case study:Trawden Natural Flood Management Scoping Study + (Runoff pathway management)
- Case study:Harbertonford Flood Alleviation Scheme + (SUDS)
- Case study:Chambers Wharf + (SUDS)
- Case study:Rams Brewery + (SUDS)
- Case study:Nigg Bay Managed Realignment Scheme + (Salt marsh and mudflat restoration)
- Case study:Alkborough tidal defence scheme + (Salt marsh and mudflat restoration)
- Case study:Humber Estuary Erosion Protection Programme + (Salt marsh and mudflat restoration)
- Case study:North Norfolk Coast + (Salt marsh and mudflat restoration)
- Case study:Hesketh Out Marsh Managed Realignment + (Salt marsh and mudflat restoration)
- Case study:Fingringhoe Managed Realignment + (Salt marsh and mudflat restoration)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (Salt marsh and mudflat restoration)
- Case study:Sandwich Tidal Defence Scheme + (Salt marsh and mudflat restoration)
- Case study:Levington Saltmarsh Restoration, Suffolk + (Salt marsh and mudflat restoration)
- Case study:Rhymney Great Wharf + (Salt marsh and mudflat restoration)
- Case study:Waldringfield Flood Defence Scheme, Suffolk + (Salt marsh and mudflat restoration)
- Case study:Hightown Sand Dune Restoration + (Sand dune restoration)
- Case study:South Milton Sands + (Sand dune restoration)
- Case study:Sandscaping + (Sandscaping)
- Case study:Sutcliffe Park + (Boardwalks)
- Case study:Environmental regeneration project in Magro river bed + (Selective removal of organic muds and sludge contaminated with toxic)
- Case study:Knepp Rewilding Project + (Selective removal of organic muds and sludge contaminated with toxic)
- Case study:River Avon Our Water Environment + (Set-back fencing & riparian planting)
- Case study:Hierdense Beek + (Shading)
- Case study:Allt Lorgy River Restoration + (Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned.)
- Case study:Wyre Riparian Restoration Initiative + (Soft engineering methods)
- Case study:Harbertonford Flood Alleviation Scheme + (Surface drainage systems improved)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Surface drainage systems improved)
- Case study:River Ray Rural Flooding + (Surface drainage systems improved)