Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Improvement of natural flows)
- Case study:Knepp Rewilding Project + (Selective removal of organic muds and sludge contaminated with toxic)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Improving water quality)
- Case study:South Calder Water deculverting and habitat restoration + (Improving water quality)
- Case study:River Seaton: Abandoned Metal Mines + (Improving water quality)
- Case study:Wildling the Tame + (Improving water quality)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Install a "green filter" to treat waste water)
- Case study:Markway Stream Restoration + (Installation of a clay plug)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Installation of a pumping station powered by a wind turbine.)
- Case study:Letting the Dove Flow + (Installing large woody material)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Landscaping and cleaning of the area (rubble removal)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Laying of 2)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Laying of drinking troughs and the creation of pits to house the fish fauna.)
- Case study:Restoration of Enningdalsälv River + (Liming)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock access)
- Case study:Nar SSSI project + (Maintain water vole habitat)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Melides Lagoon Wastewater System; Melides Camping Site Wastewater Treatment; Reducing debris deposition in the Lagoon; Creation of infrastructure for nature tourism and environmental education on the banks of the lagoon and surrounding areas (walkways)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Moorland restoration)
- Case study:Exmoor Mires Partnership + (Surface drainage systems improved)
- Case study:Pumlumon Peatland Restoration for Floodwater Management + (Moorland restoration)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Natural water purification systems; Creation of a good system of access points)
- Case study:River Cole- Life Project + (Livestock access)
- Case study:Restoration of Grobruelva + (New pipe for sewage runoff along a side beck of Grobruelva)
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe + (New shingle beach)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Remove the old small bridge)
- Case study:Western Rother Fishery Habitat Enhancement + (Non BAP habitat creation/restoration)
- Case study:Upper Welland Water Friendly Farming Project + (Non BAP habitat creation/restoration)
- Case study:Wye Herefordshire Improvement Project + (Non BAP habitat creation/restoration)
- Case study:The South Hams River Improvement Project (SHRImP) + (Creation of fish passes)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (One gate was kept in the river to prevent erosion)
- Case study:Sutcliffe Park + (Boardwalks)
- Case study:Restoration of the marsh "Gallega" + (Permeabilize the side wall of the FAO)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Prohibition of pumping of water)
- Case study:Wyndham Park, Grantham + (Public access to river)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (Putting up fences and drinking points for livestock)
- Case study:Alma Road Rain Gardens + (Rain gardens)
- Case study:Rewilding Enfield's Urban Rivers + (Rain gardens)
- Case study:Friends of Bottesford Beck + (Removal of rubbish)
- Case study:Renaturierung Untere Havel + (Create more natural flow regime)
- Case study:Camargue’s former saltworks + (Reconnection between the sea and the lagoons)
- Case study:Guadiamar Green Corridor Project + (Elimination of pollutants due to the discharge of toxic sludge)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (Recovering natural landscapes)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (Recovering natural landscapes)
- Case study:Černý potok stream restoration scheme + (Recovering natural landscapes)
- Case study:Soaring connections: restoring people, wildlife & place + (Recovering natural landscapes)
- Case study:West Allen: Abandoned Metal Mines + (Reduce pollution risk)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Rehabilitation and valorisation of the Coj … Rehabilitation and valorisation of the Cojillas tidal mill; Connection project and use of livestock tracks and rural roads as green corridor; Enhancement of the connection marsh-city in front of 26 de Abril de 1963 square and estuary promenade; Project for the connection and use of livestock tracks and rural roads as green corridors (Odiel river border to the hanging bridge of a-49); Enhancement of the marsh-city connection in front of the San Felice de Circeo promenade and the surroundings of the Tejar streame and the surroundings of the Tejar stream)
- Case study:Timber float restorations at River Iijoki + (Rehabilitation of water levels in nearby lakes)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (Reintroducing salmon population to the river)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Removal of a flap valve)
- Case study:Platt Brook Restoration + (Removal of accumulated debris and silt.)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of fallen trees)