Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Diffusing the Issue in rural Ribble - Easington + (UK BAP habitat creation/restoration)
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (UK BAP habitat creation/restoration)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (UK BAP habitat creation/restoration)
- Case study:Wye Herefordshire Improvement Project + (UK BAP habitat creation/restoration)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Fences)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Fences and animal feeders were installed)
- Case study:Bures Mill fish by-pass + (Fish by-pass channel)
- Case study:Tungelroyse beek + (Fish by-pass channel)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Fish habitat restoration)
- Case study:Diversion of the River Nith + (Addition of boulders to bed)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Fish habitat restoration)
- Case study:Test and Itchen River Restoration Strategy + (Fish habitat restoration)
- Case study:Old Station Beat restoration, River Test at Bossington + (Fish habitat restoration)
- Case study:PHish - Powys Habitat Improvement Scheme + (Fish stocking)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (General cleaning of the area)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Moorland restoration)
- Case study:Wansbeck 100 + (Hardened crossing points)
- Case study:Delivering Multiple Benefits for Water on Foston Brook + (Hardened crossing points)
- Case study:The South Hams River Improvement Project (SHRImP) + (Creation of fish passes)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Improve and adapt existing sanitation infrastructure)
- Case study:Ballinderry Freshwater Pearl Mussel Rescue Project + (Improve the river for mussels to survive)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Improvement of local paths and river banks)
- Case study:The Ciobarciu Wetland Project + (Improvement of natural flows)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Improvement of natural flows)
- Case study:Knepp Rewilding Project + (Selective removal of organic muds and sludge contaminated with toxic)
- Case study:Knepp Rewilding Project + (Improving fish migration)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Improving water quality)
- Case study:South Calder Water deculverting and habitat restoration + (Improving water quality)
- Case study:River Seaton: Abandoned Metal Mines + (Improving water quality)
- Case study:Wildling the Tame + (Improving water quality)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Install a "green filter" to treat waste water)
- Case study:Markway Stream Restoration + (Installation of a clay plug)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Installation of a pumping station powered by a wind turbine.)
- Case study:Letting the Dove Flow + (Installing large woody material)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Landscaping and cleaning of the area (rubble removal)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Laying of 2)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Laying of drinking troughs and the creation of pits to house the fish fauna.)
- Case study:Restoration of Enningdalsälv River + (Liming)
- Case study:River Cole- Life Project + (Livestock access)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock access)
- Case study:Nar SSSI project + (Maintain water vole habitat)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Melides Lagoon Wastewater System; Melides Camping Site Wastewater Treatment; Reducing debris deposition in the Lagoon; Creation of infrastructure for nature tourism and environmental education on the banks of the lagoon and surrounding areas (walkways)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Moorland restoration)
- Case study:Exmoor Mires Partnership + (Surface drainage systems improved)
- Case study:Pumlumon Peatland Restoration for Floodwater Management + (Moorland restoration)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Natural water purification systems; Creation of a good system of access points)
- Case study:Restoration of Grobruelva + (New pipe for sewage runoff along a side beck of Grobruelva)
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe + (New shingle beach)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Remove the old small bridge)
- Case study:Western Rother Fishery Habitat Enhancement + (Non BAP habitat creation/restoration)
- Case study:Upper Welland Water Friendly Farming Project + (UK BAP habitat creation/restoration)