Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rodley weir by pass channel + (Created bird hides and pond banks on Rodley Nature Reserve using site-won materials)
- Case study:Doñana 2005 + (Creating the post of Coordinator to drive the project "Doñana 2005")
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Creating an extended network of locks and dams to ensure a higher level of moisture)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of a new estuary)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Creation of a path and small wooden brides; Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Creation of didactic panels and signs)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Creation of facilities for the visit and educational use of the area)
- Case study:Renaturierung Untere Havel + (Create more natural flow regime)
- Case study:Water of Dye Fish Pass Project + (Creation of fish passes)
- Case study:The South Hams River Improvement Project (SHRImP) + (Creation of fish passes)
- Case study:Ashlone Wharf FCRM scheme + (Creation of fish passes)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Zero river restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Scolo Desolino restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Rio Sant'Ambrogio restoration project + (Creation of in-stream wetland)
- Case study:Pagana canal restoration project + (Creation of in-stream wetland)
- Case study:Isar-Plan + (embedding of rootballs and tree trunks)
- Case study:River Skerne- Life project + (Creation of new bicycle path)
- Case study:Lullingstone Castle + (Tree management)
- Case study:Ddu Restoration Project + (Deculverting)
- Case study:Deculverting Djupsund stream + (Deculverting)
- Case study:Water Quality Restoration River Dun- Canal Bypass Weirs + (Diversion of water flow)
- Case study:Lodge Burn Flood Alleviation Scheme + (Diversion of water main and supporting beam - obstruction to flow.)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Drinking troughs and fences are placed to limit trampling in the stream)
- Case study:Watercress Farm Rewetting Project + (Ecosulis advocated for a modification to the pond's design)
- Case study:Guadiamar Green Corridor Project + (Elimination of pollutants due to the discharge of toxic sludge)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Elimination of wastewater connections)
- Case study:Diffusing the Issue in rural Ribble + (Farm infrastructure interventions)
- Case study:The Pow Beck Improvement Project + (Farm infrastructure interventions)
- Case study:Upper Welland Water Friendly Farming Project + (Farm infrastructure interventions)
- Case study:Essex Healthy Headwaters River Restoration Project + (Farm infrastructure interventions)
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck + (Farm infrastructure interventions)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Farm infrastructure interventions)
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (Farm infrastructure interventions)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Farm infrastructure interventions)
- Case study:Wye Herefordshire Improvement Project + (Farm infrastructure interventions)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Fences)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Fences and animal feeders were installed)
- Case study:The South Hams River Improvement Project (SHRImP) + (Creation of fish passes)
- Case study:Bures Mill fish by-pass + (Fish by-pass channel)
- Case study:Tungelroyse beek + (Fish by-pass channel)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Fish habitat restoration)
- Case study:Diversion of the River Nith + (Addition of boulders to bed)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Fish habitat restoration)
- Case study:Test and Itchen River Restoration Strategy + (Fish habitat restoration)
- Case study:Old Station Beat restoration, River Test at Bossington + (Fish habitat restoration)
- Case study:PHish - Powys Habitat Improvement Scheme + (Fish stocking)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (General cleaning of the area)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Moorland restoration)
- Case study:Wansbeck 100 + (Hardened crossing points)
- Case study:Delivering Multiple Benefits for Water on Foston Brook + (Hardened crossing points)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Improve and adapt existing sanitation infrastructure)
- Case study:Ballinderry Freshwater Pearl Mussel Rescue Project + (Improve the river for mussels to survive)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Improvement of local paths and river banks)
- Case study:The Ciobarciu Wetland Project + (Improvement of natural flows)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Improvement of natural flows)
- Case study:Knepp Rewilding Project + (Selective removal of organic muds and sludge contaminated with toxic)