Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Sutcliffe Park + (Boardwalks)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (One gate was kept in the river to prevent erosion)
- Case study:Herinrichting beekdal Tongelreep + (Bouwen met Natuur)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Fences and animal feeders were installed)
- Case study:Chambers Wharf + (roosting posts)
- Case study:Salmon Conservation + (Buying off Severn Estuary drift nets)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Cattle drinks)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Cleaning of spawning gravels)
- Case study:Environmental restoration of the river Zújar + (Conditioning of recreational areas)
- Case study:Medmerry Managed Realignment Scheme + (Constructed new freshwater outfall structures)
- Case study:Saltburn Gill ironstones mines + (Construction of a Treatment Plant)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Construction of two wooden observation towers)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Consultation)
- Case study:Renaturierung Untere Havel + (Create more natural flow regime)
- Case study:Knepp Rewilding Project + (Selective removal of organic muds and sludge contaminated with toxic)
- Case study:Rodley weir by pass channel + (Created bird hides and pond banks on Rodley Nature Reserve using site-won materials)
- Case study:Doñana 2005 + (Creating the post of Coordinator to drive the project "Doñana 2005")
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Creating an extended network of locks and dams to ensure a higher level of moisture)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of a new estuary)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Elimination of wastewater connections)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Creation of a path and small wooden brides; Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Creation of didactic panels and signs)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Creation of didactic panels and signs)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Creation of facilities for the visit and educational use of the area)
- Case study:Water of Dye Fish Pass Project + (Creation of fish passes)
- Case study:The South Hams River Improvement Project (SHRImP) + (Creation of fish passes)
- Case study:Ashlone Wharf FCRM scheme + (Creation of fish passes)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Zero river restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Scolo Desolino restoration project + (Creation of in-stream and out-stream wetland)
- Case study:Rio Sant'Ambrogio restoration project + (Creation of in-stream wetland)
- Case study:Pagana canal restoration project + (Creation of in-stream wetland)
- Case study:Isar-Plan + (embedding of rootballs and tree trunks)
- Case study:River Skerne- Life project + (Creation of new bicycle path)
- Case study:Lullingstone Castle + (Tree management)