Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Awaiting results)
- Case study:Arborfield nature like bypass and weirs project + (Awaiting results)
- Case study:Mayesbrook Climate Change Park restoration project + (Awaiting results)
- Case study:River Alt at Knowsley + (Awaiting results)
- Case study:Restoration of Longinoja brook + (Awaiting results)
- Case study:Skjern River Project + (Awaiting results)
- Case study:Soaring connections: restoring people, wildlife & place + (Awaiting results)
- Case study:Spring Meadow Meander Restoration + (Awaiting results)
- Case study:River Don Restoration project + (Awaiting results)
- Case study:Bird reserve “O Grove” (Pontevedra) + (Awaiting results)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Awaiting results)
- Case study:Bowston Weir Removal + (Awaiting results)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Improvement)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Improvement)
- Case study:Guadiamar Green Corridor Project + (Improvement)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Improvement)
- Case study:Ladywell Fields (QUERCUS) + (Improvement)
- Case study:Isar-Plan + (Improvement)
- Case study:Morava restoration project + (Improvement)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Improvement)
- Case study:Mayesbrook Climate Change Park restoration project +
- Case study:New Forest LIFE project + (Improvement)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Improvement)
- Case study:Regelsbrunner Aue + (Improvement)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Improvement)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Improvement)
- Case study:Restoration of riparian zone in Aragon River + (Improvement)
- Case study:River Avon at East Chisenbury + (Improvement)
- Case study:River Roding at Ray Lodge Park + (Improvement)
- Case study:River Somer channel enhancement, Midsomer Norton + (Improvement)
- Case study:RSPB Fowlmere Nature Reserve + (Improvement)
- Case study:Refilling the meanders of the Colostre + (Improvement)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Improvement)
- Case study:Sutcliffe Park + (Improvement)
- Case study:Skjern River Project +
- Case study:The Babina Restoration Project + (Improvement)
- Case study:Soaring connections: restoring people, wildlife & place +
- Case study:River Skerne- Life project + (Improvement)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Improvement)
- Case study:The Holbina-Dunavat Restoration Project + (Improvement)
- Case study:The Fortuna Restoration Project + (Improvement)
- Case study:The Cernovca Restoration Project + (Improvement)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Improvement)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Improvement)
- Case study:Vallacuera Ravine. Removal of a dyke + (Improvement)
- Case study:Vreugderijkerwaard side channel + (Improvement)
- Case study:ReNaturalize + (Improvement)
- Case study:River Don Restoration project +
- Case study:Beekherstel Leerinkbeek + (Improvement)
- Case study:Beekherstel Buurserbeek + (Improvement)