Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Doñana 2005 + (Before measures implemented)
- Case study:Adams Mill enhancements + (No)
- Case study:Diversion of the River Nith + (No)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (No)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (No)
- Case study:River Alt at Knowsley + (No)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (No)
- Case study:Sutcliffe Park + (No)
- Case study:Skjern River Project + (No)
- Case study:The Babina Restoration Project + (No)
- Case study:Remeandering of the Drésine and of the Remoray stream + (No)
- Case study:Remeandering of the Mardereau stream at Sorigny + (No)
- Case study:The Fortuna Restoration Project + (No)
- Case study:River of Life + (No)
- Case study:The Cernovca Restoration Project + (No)
- Case study:Spring Meadow Meander Restoration + (No)
- Case study:River Cole- Life Project + (No)
- Case study:River Don Restoration project + (No)
- Case study:LIFE Segura Riverlink (Through rivers) + (No)
- Case study:Bird reserve “O Grove” (Pontevedra) + (No)
- Case study:Restoration in Bognelva + (No)
- Case study:TEST Deculverting the Texas Valley Stream 1 + (No)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Yes)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Yes)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Yes)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Yes)
- Case study:Guadiamar Green Corridor Project + (Yes)
- Case study:Arborfield nature like bypass and weirs project + (Yes)
- Case study:Ladywell Fields (QUERCUS) + (Yes)
- Case study:Isar-Plan + (Yes)
- Case study:Langonnet river + (Yes)
- Case study:Meers - Floodplain lowering + (Yes)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Yes)
- Case study:Mayesbrook Climate Change Park restoration project + (Yes)
- Case study:New Forest LIFE project + (Yes)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Yes)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Yes)
- Case study:Restoration of riparian zone in Aragon River + (Yes)
- Case study:River Somer channel enhancement, Midsomer Norton + (Yes)
- Case study:Ouzel habitat improvement + (Yes)
- Case study:RSPB Fowlmere Nature Reserve + (Yes)
- Case study:Kentchurch Weir Removal + (Yes)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Yes)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (Yes)
- Case study:Soaring connections: restoring people, wildlife & place + (Yes)
- Case study:River Skerne- Life project + (Yes)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Yes)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Yes)
- Case study:Vallacuera Ravine. Removal of a dyke + (Yes)
- Case study:ReNaturalize + (Yes)