This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (New riverbed along old channel,, Putting up fences and drinking points for livestock,Adjusting discharges and creating a monophogenetic discharge, Management regarding letting the river draw a natural river bed,,,)
- Case study:HPP Blanca + (New riverbed along old channel,,Creation of fish passes, ,Monitoring strategy,,Improved cooperation between energy producers and ecologists,)
- Case study:Little Waltham Meadows Back Channel creation + (New sluice structures,Creation of backwaters, Creation of wet woodland, Protect/restore riparian zone,, ,,Volunteer engagement,,)
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (Opening inlets to side channels, Creation of gravel deflectors,, ,,,)
- Case study:Chinbrook Meadows Wetlands + (Partial diversion of river,Wetland habitat,, ,Planting wildflower mixes, Riparian tree planting, plug planting,Community Events, Community consultation, Community Events, Community Litter-picking work, Volunteer work parties using the local community.,,)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Partially deletion of barriers, Building o … Partially deletion of barriers, Building of armourstone downstream of the structure was built to consolidate the bank and create a channel preferential flow to guide the fish,, ,The work was carried out dry by temporary diversion of the watercourse (cofferdam, pumping and return of water downstream site) to limit their impact on the environment.,,o limit their impact on the environment.,,)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (Partially deletion of barriers, Deposition of blocks to counter erosion and create a diverse profile,, ,Preservation of side walls to prevent erosion,,)
- Case study:Lullingstone Castle + (Placement of faggots, Deflectors, Marginal planting,,,Channel narrowing, Decrease sedimentation, Tree management, Cut back of trees,,,,)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species, Removal of inv … Planting of native species, Removal of invasive plants, Restoring riparian vegetation, Structuring of shoreline,,Alloctone species control, Vegetation management,, ,Management of undesirable plant species, Implementation of best practice land & soil management, Promotion of riparian vegetation and natural re-growth of bankside, Riparian tree planting, Removal of invasive species,,Volunteer engagement, Creation of a Land Stewardship Network, Community education (talks and workshops),rk, Community education (talks and workshops),)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species, Removal of inv … Planting of native species, Removal of invasive species, Structuring of shoreline, Weir removal, Creation of fish passes,,Improving fish migration, Alloctone species control,, ,Management of undesirable plant species, Implementation of best practice land & soil management, Promotion of riparian vegetation and natural re-growth of bankside, Riparian tree planting, Removal of invasive species,Volunteer engagement, Creation of a Land Stewardship Network, Community education (talks and workshops,ork, Community education (talks and workshops,)
- Case study:Sutcliffe Park + (Planting of native species,,Creation of pond, Creation of a lake, Wildflower meadows,Creation of new channel, Deculverting, Meandering channel, Boardwalks, Paths, Seating areas, Viewing points,,,Community engagement,)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Planting, Aggregates added to riverbed,, Drinking troughs and fences are placed to limit trampling in the stream, A ford is also built to facilitate the passage of animals and gear.,,,)
- Case study:River Cole- Life Project + (Planting, Depth variation,,Floodplain spillways,,Creation of secondary channel, Adding sinuosity, Creation of backwater, Livestock access, New crossings,,,)
- Case study:Meades water garden regeneration project + (Planting, Introduction of gravel, Weir removal,,Creation of wetland, Vegetation removal, ,,,Public consultation, Information provision,)
- Case study:Highland Water at Warwickslade Lawn + (Planting, Introduction of gravel,,,Re-meandering, ,,,)
- Case study:Langford Lakes project + (Planting, Sediment trap building, Morphological diversification, Diversification of in-channel features, Weir construction,,, ,,,)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (Planting, Weir removal,,, ,,,Participation in monitoring,Participation in maintenance,Information provision,Consultation)
- Case study:Bleinheim Palace Project + (Planting,Creation of pools and riffles, Introduction of spawning gravels,,Creation of backwaters,Channel narrowing, ,,,)
- Case study:Ladywell Fields (QUERCUS) + (Planting,Depth variation,Removal of fencing,Creation of backwaters,Creation of terraces,New footpaths,Creation of meanders ,,cafe built and entrances to the park improved,Consultation)
- Case study:River Avon Stream project + (Planting,Depth variation,Soft erosion solutions,Weir removal,Creation of wetland,Connection to wider floodplain,Adding sinuosity, ,,,Consultation,Participation in design)
- Case study:River Dee + (Planting,Introduction of spawning gravels,Regrading,,Adding sinuosity, ,,,Information provision,Consultation,Participation in design)
- Case study:Kleblach-Side channel + (Planting,Removal of embankments,Creation of side channel,Creation of groynes ,,,)
- Case study:Creation and restoration of a riparian zone + (Pond creation,,River forest has been restored through the plantation of species typical from habitat 92AO, ,,,)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Providing of continuity,,Protection of alluvial forests by connecting existing stocks to the fluvial dynamics,Reconnection of cutoff meander, ,,Population’s awareness raising for the river habitat.,)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Providing of continuity,Creation of fish spawn nursing places,Restoration of the connection of side arms, Creation of fish refuge areas,,Planting, Removal of exotic plants,, ,,Recreation,Tourism,Information provision,Consultation)
- Case study:Beekherstel Willinkbeek + (Puinbestorting verwijderd,, ,,,)
- Case study:River Skerne- Life project + (Re-grading and lowering,Deflectors,Lowerin … Re-grading and lowering,Deflectors,Lowering of floodplain,Creation of wetland, Protect/restore riparian zone,,Adding sinuosity, Creation of backwater, Creation of new bicycle path, Revetting and supporting river banks,More sensitive floodplain maintenance,,Citizen participation in the restoration project,,Participation in works,Information provision,Participation in design,Consultationision,Participation in design,Consultation)
- Case study:Bringing Back the Bulbourne + (Re-grading, Bed raising,,Scrapes, Floodplain reconnection,,Introducing large woody debris, Channel narrowing, ,,Citizen participation in the restoration project,,Survey work, Fish surveys,)
- Case study:Rother meander reconnection + (Re-grading,Planting, Riffle creation,,Floodplain reconnection, Creation of backwaters, Creation of pond,,Re-instatement of old course, protect old lock from erosion. ,,,)
- Case study:Odder Stream Restoration + (Re-introducing spawning gravel, Bed raising,,, ,Removed 25 drain systems and 7 ditches,,)
- Case study:Deculverting Djupsund stream + (Re-introducing spawning gravel,,Bigger diameter pipe under way, Deculverting,,,,)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones,Building submerged weir, Creation of fish passes,,, ,,,)
- Case study:Vindel River LIFE + (Re-introducing stones,Re-introducing grave … Re-introducing stones,Re-introducing gravel, Dam removal, Creation of fish passes, Introducing large woody debris,,Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure, Vegetation management,,Re-instatement of old course ,,,nagement,,Re-instatement of old course ,,,)
- Case study:Logie Burn Restoration Project + (Re-profiling, construction of bunds, Creat … Re-profiling, construction of bunds, Creation of revetments, Bank stabilisation, Bank protection,,Creation of backwaters, Creation of wetland, Livestock fencing, Fencing,,Re-meandering The meanders were cleared of sediment, vegetation and organic debris,,,Information board erected,rganic debris,,,Information board erected,)
- Case study:River Glaven conservation group + (Re-profiling,Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain,,Channel narrowing,Creation of braided channel ,,,)
- Case study:River Darent at Hawley Manor + (Re-working of gravels to create riffles, Creation of pools, Creation of bars,,,Channel narrowing, Adding sinuosity, ,,,)
- Case study:Long Preston Deeps Flood Plain Project + (Realignment of flood banks,,River naturalisation, Scrapes, Reconnecting palaeo riverine features, Floodplain reconnection,, ,,,)
- Case study:Restoration project in Verde River + (Recess side slopes,Barrier removal,Removal of exotic plants,Elimination of structural elements concreted,Removal of speckles ,Improve forest management and agricultural,,)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (Recess side slopes,Barrier removal,Removal of exotic plants, Creation of a flood expansion area, Restoring riparian vegetation,, ,,,)
- Case study:Mayesbrook Climate Change Park restoration project + (Recovering connectivity longitudinal and t … Recovering connectivity longitudinal and transversal, Recovery of channel morphology, Adding sinuosity, Creation of pools and riffles, Bank reprofiling,,Floodplain reconnection, Sustainable urban drainage ponds (SUDs), Excavation for floodplain creation, Habitat restoration, Protect/restore riparian zone, Restoring riparian vegetation,,Improvement of channel morphology, Creation of backwater, Reedbed creation, Re-meandering, ,Fencing, Monitoring strategy,Awareness raising, Improved public access,Public consultation,mproved public access,Public consultation,)
- Case study:Guadiamar Green Corridor Project + (Recovering connectivity longitudinal and t … Recovering connectivity longitudinal and transversal,Buffer strips,Recovery of dynamic river system, Restoring riparian vegetation,,Remove drains and pipes Elimination of pollutants due to the discharge of toxic sludge,Recovering natural habitats,Recovering natural landscapes,,, habitats,Recovering natural landscapes,,,)
- Case study:The Pentney Restoration Project + (Recovery of channel morphology, Introduction of spawning gravels,,Habitat creation, Habitat enhancement, Riparian habitat restoration, Riparian planting,, ,,,)
- Case study:Environmental restoration of the river Zújar + (Recovery of channel morphology,,Protecting and promoting wildlife, Assessment and monitoring program Conditioning of recreational areas,,,)
- Case study:River Wandle: Silt & SuDs + (Reduce diffuse pollution,,, ,,Community involvement,)
- Case study:Upper Welland Water Friendly Farming Project + (Reduce diffuse pollution,,, UK BAP habitat creation/restoration, Non BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,,)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope, Deflectors,Planti … Reduction of bank slope, Deflectors,Planting,Creation of fish ladders, Depth variation,,Creation of a lake,,Re-instatement of old course, Adding sinuosity, Creation of meanders, ,Ensuring biodiversity,Landscape,Improved public access,Information provision,Consultation access,Information provision,Consultation)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope,Reventment renewal,Creation of fish ladders,Riverbed stabilization, Weir construction,,Riparian planting, Removal of exotic plants,,Channel widening ,Ensuring biodiversity,Recreation,Decreased flood risk,)
- Case study:Vester Nebel Restoration + (Regrading, Introduction of spawning gravels,,,Creation of new channel, Adding sinuosity, ,,,Information provision,Consultation,Participation in design,Participation in monitoring)
- Case study:River Kennet Restoration at Durnsford + (Regrading,Removal of invasive species,Cut … Regrading,Removal of invasive species,Cut back of trees,Depth variation, Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain, Creation of wetland,Channel narrowing, Adding sinuosity, ,Management of organic and inorganic sediments,Improved public access,norganic sediments,Improved public access,)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Remodeling and extension of the river bank … Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna, especially amphibious.,Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species, and a first band of elophytes (Phragmites australis, Typha latifolia) and a second with shrubby and planar shrubby and arboreal species (Salix spp, Populus spp, Ulmus minor, Quercus robur). , ,Landsteward agreement,,Quercus robur). , ,Landsteward agreement,,)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Removal of 22 flaps,Introducing sediment,Creation of a flood expansion area, Prohibition of pumping of water,,,)