Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value "Puinbestorting verwijderd,, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:River Skerne- Life project  + (Re-grading and lowering,Deflectors,LowerinRe-grading and lowering,Deflectors,Lowering of floodplain,Creation of wetland, Protect/restore riparian zone,,Adding sinuosity, Creation of backwater, Creation of new bicycle path, Revetting and supporting river banks,More sensitive floodplain maintenance,,Citizen participation in the restoration project,,Participation in works,Information provision,Participation in design,Consultationision,Participation in design,Consultation)
  • Case study:Bringing Back the Bulbourne  + (Re-grading, Bed raising,,Scrapes, Floodplain reconnection,,Introducing large woody debris, Channel narrowing, ,,Citizen participation in the restoration project,,Survey work, Fish surveys,)
  • Case study:Rother meander reconnection  + (Re-grading,Planting, Riffle creation,,Floodplain reconnection, Creation of backwaters, Creation of pond,,Re-instatement of old course, protect old lock from erosion. ,,,)
  • Case study:Odder Stream Restoration  + (Re-introducing spawning gravel, Bed raising,,, ,Removed 25 drain systems and 7 ditches,,)
  • Case study:Deculverting Djupsund stream  + (Re-introducing spawning gravel,,Bigger diameter pipe under way, Deculverting,,,,)
  • Case study:Restoration of Reinikkalankoski torrent  + (Re-introducing stones,Building submerged weir, Creation of fish passes,,, ,,,)
  • Case study:Vindel River LIFE  + (Re-introducing stones,Re-introducing graveRe-introducing stones,Re-introducing gravel, Dam removal, Creation of fish passes, Introducing large woody debris,,Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure, Vegetation management,,Re-instatement of old course ,,,nagement,,Re-instatement of old course ,,,)
  • Case study:Logie Burn Restoration Project  + (Re-profiling, construction of bunds, CreatRe-profiling, construction of bunds, Creation of revetments, Bank stabilisation, Bank protection,,Creation of backwaters, Creation of wetland, Livestock fencing, Fencing,,Re-meandering The meanders were cleared of sediment, vegetation and organic debris,,,Information board erected,rganic debris,,,Information board erected,)
  • Case study:River Glaven conservation group  + (Re-profiling,Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain,,Channel narrowing,Creation of braided channel ,,,)
  • Case study:River Darent at Hawley Manor  + (Re-working of gravels to create riffles, Creation of pools, Creation of bars,,,Channel narrowing, Adding sinuosity, ,,,)
  • Case study:Long Preston Deeps Flood Plain Project  + (Realignment of flood banks,,River naturalisation, Scrapes, Reconnecting palaeo riverine features, Floodplain reconnection,, ,,,)
  • Case study:Restoration project in Verde River  + (Recess side slopes,Barrier removal,Removal of exotic plants,Elimination of structural elements concreted,Removal of speckles ,Improve forest management and agricultural,,)
  • Case study:Improvement of the Terri River in the industrial zone (Phase I and II)  + (Recess side slopes,Barrier removal,Removal of exotic plants, Creation of a flood expansion area, Restoring riparian vegetation,, ,,,)
  • Case study:Mayesbrook Climate Change Park restoration project  + (Recovering connectivity longitudinal and tRecovering connectivity longitudinal and transversal, Recovery of channel morphology, Adding sinuosity, Creation of pools and riffles, Bank reprofiling,,Floodplain reconnection, Sustainable urban drainage ponds (SUDs), Excavation for floodplain creation, Habitat restoration, Protect/restore riparian zone, Restoring riparian vegetation,,Improvement of channel morphology, Creation of backwater, Reedbed creation, Re-meandering, ,Fencing, Monitoring strategy,Awareness raising, Improved public access,Public consultation,mproved public access,Public consultation,)
  • Case study:Guadiamar Green Corridor Project  + (Recovering connectivity longitudinal and tRecovering connectivity longitudinal and transversal,Buffer strips,Recovery of dynamic river system, Restoring riparian vegetation,,Remove drains and pipes Elimination of pollutants due to the discharge of toxic sludge,Recovering natural habitats,Recovering natural landscapes,,, habitats,Recovering natural landscapes,,,)
  • Case study:The Pentney Restoration Project  + (Recovery of channel morphology, Introduction of spawning gravels,,Habitat creation, Habitat enhancement, Riparian habitat restoration, Riparian planting,, ,,,)
  • Case study:Environmental restoration of the river Zújar  + (Recovery of channel morphology,,Protecting and promoting wildlife, Assessment and monitoring program Conditioning of recreational areas,,,)
  • Case study:River Wandle: Silt & SuDs  + (Reduce diffuse pollution,,, ,,Community involvement,)
  • Case study:Upper Welland Water Friendly Farming Project  + (Reduce diffuse pollution,,, UK BAP habitat creation/restoration, Non BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,,)
  • Case study:Improving the structure of the Lahn-patak in Hungary  + (Reduction of bank slope, Deflectors,PlantiReduction of bank slope, Deflectors,Planting,Creation of fish ladders, Depth variation,,Creation of a lake,,Re-instatement of old course, Adding sinuosity, Creation of meanders, ,Ensuring biodiversity,Landscape,Improved public access,Information provision,Consultation access,Information provision,Consultation)
  • Case study:Rinya water-system reconstruction  + (Reduction of bank slope,Reventment renewal,Creation of fish ladders,Riverbed stabilization, Weir construction,,Riparian planting, Removal of exotic plants,,Channel widening ,Ensuring biodiversity,Recreation,Decreased flood risk,)
  • Case study:Vester Nebel Restoration  + (Regrading, Introduction of spawning gravels,,,Creation of new channel, Adding sinuosity, ,,,Information provision,Consultation,Participation in design,Participation in monitoring)
  • Case study:River Kennet Restoration at Durnsford  + (Regrading,Removal of invasive species,Cut Regrading,Removal of invasive species,Cut back of trees,Depth variation, Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain, Creation of wetland,Channel narrowing, Adding sinuosity, ,Management of organic and inorganic sediments,Improved public access,norganic sediments,Improved public access,)
  • Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio  + (Remodeling and extension of the river bankRemodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna, especially amphibious.,Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species, and a first band of elophytes (Phragmites australis, Typha latifolia) and a second with shrubby and planar shrubby and arboreal species (Salix spp, Populus spp, Ulmus minor, Quercus robur). , ,Landsteward agreement,,Quercus robur). , ,Landsteward agreement,,)
  • Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon  + (Removal of 22 flaps,Introducing sediment,Creation of a flood expansion area, Prohibition of pumping of water,,,)