Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value "Hout in de beek,Beschaduwing, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Restoration of the previous riverbed of the Dadon  + (Implementation of rip rap,Habitat diversification,Implementation of vegetated boxes,Depth variation, Riverbed restoration,,,Creation of meanders, Adding sinuosity, ,,,)
  • Case study:Whit Beck River Restoration Project  + (Improvement of natural flows, Recovery of channel morphology, Introducing sediment,,Connection to wider floodplain,,Channel naturalisation, Re-meandering, ,,Community involvement, Community consultation,,)
  • Case study:Opijnen- Side channel  + (Improvement of natural flows,,Creation of side channel ,,,)
  • Case study:South Calder Water deculverting and habitat restoration  + (Improvement of natural flows,,Deculverting, Improve longitudinal connectivity,,Improvement of channel morphology, Habitat restoration, Improving water quality,,,,)
  • Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas  + (Installation of a distribution structure aInstallation of a distribution structure and monks, Creation of a bypass, Filling of drainage ditches, rehabilitation of ponds, Three tresholds are removed or redevelopped, Removal of ponds, Bank protection,,Meandering channel, ,The level of the water bodies is lowered during two months in summer and are completely drained every three to five years.,,etely drained every three to five years.,,)
  • Case study:Restoration in river Tajo and tributaries after kaolin spillage  + (Installation of bioengineering elements, Creation of fish passes,,Removal of sediments from the mines, Vegetation management,, ,,New paths near the river, Information panels for people,,)
  • Case study:River Ogwen and Nant Francon  + (Installation of cascades, Creation of pools and riffles,,,Morphology of the bed altered ,,,)
  • Case study:River Pinn Enhancement near Ickenham  + (Installation of coir rolls, Deflectors,,Creation of backwater, Creation of pools and riffles ,,,)
  • Case study:Habitat Improvements on the River Colne at West Drayton  + (Installation of coir rolls, Introduction of gravel,,,Creation of backwater ,,,)
  • Case study:Lidl  + (Installation of coir rolls, Introduction of gravel,,Habitat creation, Reedbed creation, Tree management, ,,Community Education,,)
  • Case study:River Shuttle Enhancement Works - Love Lane  + (Installation of coir rolls,, ,,,)
  • Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention  + (Installation of damming valves, Creation of islands, Creation of irregular shaped shore line,, ,,,)
  • Case study:Restoration of Grobruelva  + (Installation of gravel habitat (gravel and stones),Removal of retainment structure (Rotubekken), improvement of fish migration (at Sagvollfossen), New pipe for sewage runoff along a side beck of Grobruelva,Removal of litter (especially car tires),,)
  • Case study:The Irfon Special Area of Conservation Project  + (Installation of watergates, Fencing, Erosion Repair, Cut back of trees,,, ,Stocking,,,)
  • Case study:Blackwater River Habitat Enhancements & Fish Passage  + (Introducing large woody debris, Adding sinuosity, Improvement of natural flows,,Habitat enhancement, Improving fish migration,, ,,Decreased flood risk,,)
  • Case study:River Eye  + (Introducing large woody debris, Bed raising, Bank reprofiling, Introduction of gravel,,Tree management, Tree planting,,Channel narrowing, Creation of backwater, ,,,)
  • Case study:River Wandle Restoration Project  + (Introducing large woody debris, DeflectorsIntroducing large woody debris, Deflectors, Weir removal, Habitat diversification, Restoring riparian vegetation, Weir removal, Bank reprofiling,,Control of invasive species,,Assessment and monitoring program, Channel naturalisation, Re-meandering, Improvement of channel morphology, Creation of fish passes, Channel naturalisation, ,,Awareness raising, 'Trout in the Town' project raising the awareness of the river's value in schools, Citizen participation in the restoration project, Community consultation,,Public consultation, Participation in works, Participation in maintenance,on in works, Participation in maintenance,)
  • Case study:Eddleston water  + (Introducing large woody debris, Embankment renaturalization,,Connection to wider floodplain, Floodplain creation,,Meandering channel, ,,,)
  • Case study:New Forest LIFE project  + (Introducing large woody debris, Habitat restoration, Bed raising, Gravel augmentation,,Floodplain reconnection, Floodplain spillways,,Re-meandering, ,,,)
  • Case study:River Bure  + (Introducing large woody debris, Improvement of natural flows, Adding sinuosity,,,Channel narrowing, Channel naturalisation, ,No longer remove naturally occurring LWD,,)
  • Case study:Lower Woodsford  + (Introducing large woody debris, Removal of bank reinforcements,,Tree planting, Riparian planting, Removal of embankments, Scrapes,,Re-profiled ditch, ,,,)
  • Case study:River Glyme Stratford Restoration  + (Introducing large woody debris, Riffle creIntroducing large woody debris, Riffle creation, Introduction of spawning gravels, Restoring gravel bed, Creation of revetments, Bed raising, Bank stabilisation, Diversification of in-channel features, Bank reprofiling,,Connection to wider floodplain, Excavation for floodplain creation, Wetland habitat,,Meandering channel, ,Associated terrestrial habitat improvements at historic water meadows downstream,Community involvement, University links established, Media, Community Education,,Monitoring and survey projects, sediment taken out of system before reaching historic lakes downstream,before reaching historic lakes downstream,)
  • Case study:Bow Brook Living Landscape  + (Introducing large woody debris, Soft erosiIntroducing large woody debris, Soft erosion solutions, Bank reprofiling, Cattle drinkers,,Creation of wetland, Fencing, Tree planting, Pollarding, Control of invasive species,, ,Arable reversion to wildflower meadow, Soil Health Plan,Landowners advised, Flylife course,h Plan,Landowners advised, Flylife course,)
  • Case study:Unit 4 - North Channel Phase 1  + (Introducing large woody debris, habitat improvements,,, ,,,)
  • Case study:Unit 3a – Hurst Bridge 2013  + (Introducing large woody debris, habitat improvements,,, ,,,)