Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (Creation of gravel banks, Removal of bank reinforcements,,, ,,,)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Creation of gravel banks,Removal of sediment,Planting,Creation of fish spawn nursing places,,Adding sinuosity, ,Reduced pollution,,Information provision,Consultation)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Creation of gravel deflectors, Gravel berms, Re-introducing gravel,,Tree planting,,Introducing large woody debris, Cattle drinks, fry bays,,,)
- Case study:Morava restoration project + (Creation of groynes, Deflectors,Dyke relocation,Increase water retention area,Reconnection of river channels, Adding sinuosity, Reconnection of cutoff meander, ,,Land purchase,)
- Case study:Knock Burn low flow channel + (Creation of low flow channel,,,Re-meandering, ,,,)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches, Planting of grass, Tree planting,, Laying of drinking troughs and the creation of pits to house the fish fauna.,Maintenance of anchorages and other structures,,)
- Case study:Langonnet river + (Creation of pools and riffles, Creation of groynes, introduction of blocks, Creation of berms,,Develop riparian forest, Tree plantation,, ,,,)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles, Improvement of natural flows, Creation of pools, Creation of bars,,Scrapes, Riparian planting,,Adding sinuosity, ,,Community involvement, Engagement with schools,,)
- Case study:Manor Road Park + (Creation of pools and riffles, Introduction of gravel,,Remeandering,, ,,,)
- Case study:Castle Acre Rehabilitation Project + (Creation of pools and riffles,,,Channel narrowing, ,,,)
- Case study:River Little Ouse at Thetford + (Creation of pools and riffles,,Creation of backwaters, Habitat creation, Habitat restoration, Creation of pond,,Reconnection of cutoff meander, ,,,)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (Creation of pools and riffles,,Creation of fish passes,Channel widening, ,,Community Events, River open days, School Tours,,)
- Case study:River Slea Rehabilitation + (Creation of pools, Creation of berms,,Creation of two stage channel,,Creation of meanders, Channel narrowing, Riparian planting, ,,,)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Creation of pools, Fish habitat restoration, Introducing large woody debris, Habitat restoration,,Habitat creation, Tree management,,Channel narrowing, Re-meandering, ,,Community involvement,,)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (Creation of ramp,,Reforestation and restoration of watercourses, Develop riparian forest, Riparian planting,, ,,Awareness raising by a sign,,)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Creation of revetments, Fenced off riverbank, Bank stabilisation, Cut back of trees, Tree management,,Removal of sediments,,Change in bed profile, ,,,)
- Case study:Nar SSSI project + (Creation of shoulders, Embankment creation, Creation of pools,,Ensure floodplains left unmodified,Channel narrowing, Maintain water vole habitat,,,)
- Case study:Small water retention measures in Haluzice Gorge + (Creation of stone steps, planting of vegetation on terraces, Weir construction,, ,,,)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks, Restoration of the connection of side arms, Creation of Slips, Creation of fords, Creation of potholes, Creation of gravel banks,, ,,,)
- Case study:Houghton 'trout stream' enhancements + (Creation of wooden deflectors, Cleaning of spawning gravels,,Fencing, Tree planting,, ,,,)
- Case study:Babingley River at Hillington + (Creation of wooden deflectors, Habitat diversification, Cleaning of spawning gravels,Riparian planting,,Channel narrowing, Adding sinuosity, Removal of sluice gates, Creation of fish passes, Channel naturalisation, ,,,)
- Case study:River Stour Habitat Enhancements at Great and Little Bradley + (Creation of wooden deflectors, Introducing large woody debris,,, ,,,)
- Case study:Millfield Plantation 2 + (Creation of wooden deflectors,,Floodplain reconnection,,Introducing large woody debris, silt depositon on the flood plain ,,,)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Culvert replacement/repair, Bank reprofiling,,Riparian planting, Sustainable urban drainage ponds (SUDs),,Deculverting, ,,Improved public access, Information panels for people, Riverside walkway,,)
- Case study:Lodge Burn Flood Alleviation Scheme + (Culvert replacement/repair, silt-trapping … Culvert replacement/repair, silt-trapping weir installation, habitat improvements, Rock ramp construction, Creation of fish passes,,Construction of flood wall,,Removal of pond to restore natural course and sediment transport. Diversion of water main and supporting beam - obstruction to flow.,,, supporting beam - obstruction to flow.,,,)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Culvert replacement/repair,,, ,,,)
- Case study:Restoration of the river Børselva + (Cut back of plants, Introduction of spawning gravels, Creation of mini-treshold, Creation of pools, sediment, Sediment trap building,,Erosion protection,, ,Reduced pollution, Flow management,,,)
- Case study:RSPB Fowlmere Nature Reserve + (Cut back of plants,Riffle creation,Placement of log steps to prevent erosion from deer,Bed raising,Placement of faggots,Protect/restore riparian zone,,Channel narrowing, Adding sinuosity, ,Easier management,,)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Dam removal, Creation of fish passes,,,Dam removal, Creation of fish passes ,,,)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Dam removal, Dredging of channel, Removal of island, Riverbed dug out,,Replanting of banks, removal of bunds, Reinforcing of banks, ,extension of water treatment outlet,,)
- Case study:Removal of the Fatou dam on the Beaume river + (Dam removal, Dredging of sediment (mud), Removal of sediment,,, ,,,)
- Case study:La Gotera dam removal + (Dam removal, Reconnection of river,, ,capture of fish prior to the works,,)
- Case study:Robledo de Chavela dam removal + (Dam removal, extraction and relocation of sediments, Delimitation of the channel with riprap, slope profiling, Reforestation of the riverbank,, ,Capture and transfer of fish,,)
- Case study:Removal of the Retuerta dam in the Aravalle river: + (Dam removal,, ,,,)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Dam removal,, ,,Media,,Information provision,Participation in decision process,Participation in monitoring)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Dam removal,,, ,,,)
- Case study:Restoration of habitats in Pärnu river + (Dam removal,,, ,,,)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (Dam removal,,,Channel widening, ,,,)
- Case study:Inturia dam removal + (Dam removal,,,Creation of solid flow regime ,,Creation of a path alongside the river, Creation of viewpoint with photos and data of the dam removal,)
- Case study:Bidasoa Dam removal 2 + (Dam removal,,Barrier removal, Connection to wider floodplain,, ,,,)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Dam removal,,Removal of impoundments ,,Reh … Dam removal,,Removal of impoundments ,,Rehabilitation of site by local associations,Creation of a centre to show visitors the historical heritage,Creation of a twelve kms foothpath to visit the area,Video made by Eau et Rivières de Bretagne,Brochure available in a website,Information provisionailable in a website,Information provision)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Dam removal,Revegetation, ,,,)
- Case study:Dysart Park, Grantham Habitat Improvement + (Day lighting and addition of woody material to form narrowing berms,, ,,Volunteer work parties using the local community.,)
- Case study:Rewilding Enfield's Urban Rivers + (Daylighting 1.15km of streams,Creation of wetland, Reedbed creation,,Channel naturalisation, Rain gardens,,Associated terrestrial habitat improvements, water quality testing and misconnection surveys,Community involvement, Community Education,,)
- Case study:Lunterse Beek + (Dead wood deposit, Sand deposit,,, ,,,)
- Case study:Vreugderijkerwaard side channel + (Decrease sedimentation,Creation of side channel,Increase river dynamics,Re-connect tributaries to main channel ,,,)
- Case study:Firs Farm Wetlands + (Deculverting, Ponds and pools inside the w … Deculverting, Ponds and pools inside the wetland,Creation of wetland, Creation of wet woodland, Creation of pond, Creation of side channel, Deculverting, Extensive planting, Sustainable urban drainage ponds (SUDs), Floodplain creation,, ,,Public amenity and perception, Community involvement, Community Education, Engagement with schools,,unity Education, Engagement with schools,,)
- Case study:Pymmes Park Wetlands + (Deculverting, Ponds and pools inside the w … Deculverting, Ponds and pools inside the wetland,Reedbed creation, Creation of wetland, Deculverting, Extensive planting, Sustainable urban drainage ponds (SUDs), Floodplain creation,, ,Reduced pollution,,Community involvement, Community Education, Public amenity and perception,,Education, Public amenity and perception,,)
- Case study:Brent Lodge Park Improvement + (Deculverting, Removing of concrete structures,Reedbed creation,Creation of backwater ,,Aesthetics,)
- Case study:Harrow Lodge Park + (Deculverting, Removing of concrete structures,, ,,,)
- Case study:Fairlop Plain and Fairlop Water + (Deculverting, Removing of concrete structures,, ,,,)