Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value "Beschaduwing,Dood hout inbreng, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Source to Sea Programme  + (Blocking of certain grips, Tree planting,,Creation of wetland, Riparian planting, Fencing of riparian zone, Improving fish migration,, ,,Awareness raising, Media,,Practical volunteering activities like beach cleans, Public consultation,)
  • Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors  + (Blocking of certain grips, Tree planting,Creation of wetland, Improving fish migration,, ,,Awareness raising, Media,,Practical volunteering activities like beach cleans, Public consultation,)
  • Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration  + (Blocking of certain grips, Tree planting,Creation of wetland, Improving fish migration,, ,,Awareness raising, Media,,Practical volunteering activities, Public consultation,)
  • Case study:Ddu Restoration Project  + (Boulder restoration, Addition of substrate and in channel features,,Fencing of riparian zone,,Creation of fish passes, Deculverting,Agricultural business changed its way of working,,,)
  • Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract  + (Breaking the dune barrier and establishingBreaking the dune barrier and establishing a temporary connecting channel between the lagoon and the sea,Restoration of the Ribeira de Melides, Melides Lagoon Wastewater System; Melides Camping Site Wastewater Treatment; Reducing debris deposition in the Lagoon; Creation of infrastructure for nature tourism and environmental education on the banks of the lagoon and surrounding areas (walkways, bird watching shelters, resting places); Organic rice production pilot project;,Creation of a fishing reserve and legal establishment of a recreational fishing zone in the Melides Lagoon; Creation of a local multi-stakeholder association - agriculture, tourism, environment, governance - for the commercial promotion of local products under a local trademark.,Environmental awareness raising campaing; Rehabilitation of the historical and cultural heritage of the parish (ex. St. Marinha church); development of handicraft, promotion of traditional dances and songs, and local gastronomy.,Lagoon sediments study; Water quality monitoring; Wastewater tanks cleaning campaign; Development of a local niche market oriented rice trademark and non-mass trade circuits for rice and other local products; Development of a Quality Chart for accommodation and catering (definition of quality parameters) and a Guide of Good Environmental Practices, elaborated collectively by tourism operators who voluntarily join in.tourism operators who voluntarily join in.)
  • Case study:Ruppoldingen  + (Building nature-like bypass channel, Creation of fish passes,,,Creation of fish passes, ,,,)
  • Case study:Ålgårda nature-like bypass channel at River Rolfsån  + (Building nature-like bypass channel, Creation of fish passes,,, ,,,)
  • Case study:Rodley weir by pass channel  + (Building nature-like bypass channel,,, Created bird hides and pond banks on Rodley Nature Reserve using site-won materials,,,)
  • Case study:Kuuskoski-Fishway  + (Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes,,, ,,,)
  • Case study:Restoration of Vakkolankoski Torrent  + (Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes,,, ,,,)
  • Case study:Restoration of Naarkoski Torrent  + (Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes,,, ,,,)
  • Case study:Restoration of Longinoja brook  + (Building of submerged weirs and pits,Adding sinuosity, Introduction of gravel, Creation of fish passes,,,Introducing large woody debris, Adding sinuosity, ,,,Information provision,Participation in works,Participation in monitoring)
  • Case study:Sågarsfors  + (Building of submerged weirs and pits,Introduction of gravel, Creation of fish passes,,, ,,,)
  • Case study:Restoration of Enningdalsälv River  + (Building of submerged weirs and pits,Re-introducing stones, Introduction of gravel, Creation of fish passes,,, Liming,,,)
  • Case study:Timber float restorations at River Iijoki  + (Building submerged weir, Removal of old loBuilding submerged weir, Removal of old logs, Re-introducing spawning gravel, Habitat restoration, Removal of revetments,Remeandering, Reconnection of drained river sections, Removal of embankments,Adding sinuosity, Rehabilitation of water levels in nearby lakes,fish stockings, Monitoring strategy, juridical processes,,Monitoring strategy, juridical processes,,)
  • Case study:Markeaton and Mackworth Brook (MMB) Project  + (Cattle drinkers, Livestock fencing,,, ,,,Work with farmers and land managers,)
  • Case study:Glaisdale Beck Restoration Project  + (Cattle drinkers,,Fencing, Livestock fencing, Buffer strips, Tree planting, Restoring riparian vegetation,, ,,,)
  • Case study:River Meden response to diffuse pollution  + (Cattle drinkers,,Fencing, pasture pumps,, ,,,)
  • Case study:Manthorpe Floodplain Reconnection  + (Channel modification, Gravel added, Tree Hinging,,Redundant Flood Bank Removed, Floodplain Lowered, Floodplain Roughened, Ponds added.,Multiple channels added Wild Flower Meadow area created.,,,)
  • Case study:Belton Floodplain Reconnection and River Restoration  + (Channel narrowing, Bank lowering, Gravell added, Tree Hinging,,Floodplain lowering, scrape added, floodplain roughening, Beaver dam analogue., ,,,)
  • Case study:Upper River Nairn restoration project  + (Channel realignment, embankment removal, cChannel realignment, embankment removal, channel reprofiling, installation of large wood structures,Channel realignment, channel reprofiling, reinstatement of three wetlands,Changing from a canalised straightened channel to a meandering/ wondering channel ,Riparian tree planting, fencing,,channel ,Riparian tree planting, fencing,,)
  • Case study:Broadwater Brook  + (Channel realignment,,Channel realignment, Channel realignment,,Channel realignment, Conservation measures and environmental improvement, Creation of multi stage channel, Habitat creation,,Channel realignment, Creation of new channel, Habitat creation, Habitat restoration, Improvement of channel morphology, ,Agricultural business changed its way of working, Arable reversion to wildflower meadow, Clean-up days, Diffuse pollution mitigation, Easier management, Ensuring biodiversity, Monitoring strategy,,Active involvement of local interests groups and land owners, Agreement with the owners, Awareness raising, Awareness raising by a sign, Citizen participation in the restoration project, Community Education, Community Events, Community Litter-picking work, Community based management, Community consultation, Community education (talks and workshops, Community involvement, Creation of a path alongside the river, Decreased flood risk, Engagement with a wide range of stakeholders, Engagement with schools, Improved public access, Information panels for people,,ic access, Information panels for people,,)
  • Case study:River Restoration at Hunworth (River Glaven)  + (Channel reprofiling, Re-introducing gravel, Cattle drinkers,,Removal of embankments,,Adding sinuosity, ,Reduced maintenance,,)
  • Case study:Day Brook Restoration - Gedling  + (Channel reprofiling, Recovery of channel morphology,,Floodplain reconnection,,Channel naturalisation, Re-meandering, ,,Awareness raising,,)
  • Case study:Wildling the Tame  + (Channel reprofiling, Riffle creation, Habitat restoration,,New footpaths,,Channel widening, Reedbed creation, Improving water quality,,,Improved public access,,)