Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value ",establishment of woodland,, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 28 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Brackenhurst Natural Flood Management  + (,establishment of woodland,, Runoff pathway management,,,)
  • Case study:3Rivers - Lumburn:Walkham:Tavy  + (,floodplain woodland planting,, ,Land management,,Volunteer engagement,,Survey work,)
  • Case study:River Soar Floating Pennywort Eradication  + (,herbicide spraying, Removal of invasive plants,, ,aerial sureys,,)
  • Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park  + (,mowing, adapted to the conservation of sp,mowing, adapted to the conservation of species and habitat types; adequate maintenance of borders and green belts (selective logging, preservation of trees, maintaining adequate width of green belts along ditches and watercourses), building of tourist infrastructure, which will provide a targeted visit;,control of drainage of water from secondary arrester to main dams (river) with locks; control of drainage of water from tertiary arrester; coordinated maintenance of ditches; control of the use of fertilizers and preservatives on agricultural land; respect of the prohibition of the meadows plowing from the KPLB Regulation (also for organic farmers); establishing a zoning of individual subregions where priorities are defined in cooperation with land owners and managers of the protected area and NATURA 2000 (KPLB and ZRSVN); payment for the implementation of the adjusted use on agricultural land,awareness of stakeholders on the importance of adequate maintenance of the arrester;,establishment of monitoring of qualifying species and habitat types; prepare an analysis of the development possibilities and the restructuring plan for individual agricultural holdings in cooperation with agricultural institutions and with the financial support of agricultural policy; designing common tourism products; joint marketing of products;ism products; joint marketing of products;)
  • Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain  + (,protecting and increasing biodiversity, i,protecting and increasing biodiversity, improving the landscape and the quality of water resources, ,Custody agreements,,Development of environmentally sustainable rice farming, to the increase of soft tourism and to the increase of citizens' awareness of environmental issues.tizens' awareness of environmental issues.)
  • Case study:Afon Merin Natural Process Restoration  + (15 leaky dams and scrapes.,, ,,,)
  • Case study:Gadebridge park river restoration  + (1:3 and 1:6 banks, Introduction of spawnin1:3 and 1:6 banks, Introduction of spawning gravels, Creation of pools and riffles, creation of buffer zones, Creation of low flow channel, gravel river access point, preservation of historic mill leat,Creation of multi stage channel, Improving fish migration, Lowland meadow, Maintenance of riparian vegetation, Introduction of spring flow, New ultrasonic gauging station,Improvement of channel morphology, Improving fish migration, restoring more sinuous planform Introduction of 2 foot bridges,,Engagement with a wide range of stakeholders, 2 events in the park, Junior river wardens programme, school visits, tours and presentations for local interest groups, social media video, Information boards, mailing list, project website, project mailbox, community satisfaction survey,Ecological survey, Monitoring via Fixed Point Photography, Climate change adaptation, Definition of environmental objectives and indicators and monitoring program., Removal of Stevenson Stones for display., Removal of Stevenson Stones for display)
  • Case study:Effacement du seuil de Chelles Basse sur le Miodet  + (Abundant sand was being put on the banks, Barrier removal, Blocks were used to diversify the flow,, ,Cutting trees that could be a potential danger, Setting up of a diversion channel,,,)
  • Case study:PHish - Powys Habitat Improvement Scheme  + (Acidic water amelioration, Creation of fish passes,,, Fish stocking,,,)
  • Case study:Environmental Restoration of the Lower Section of the Bembézar River and its River Environment (Phase 1)  + (Actions to improve the natural environmentActions to improve the natural environment: Cleaning of the riverbed and the riverbank; Removal of dead vegetation and cleaning of rubbish.,Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation, in an area which should be a riverside forest with species closer to the ecological climax; Removal of ailanthus and other invasive exotic species., ,,Actions of integration in a river area: Construction of a pedestrian path 2 meters wide and 3,080 meters long along the riverside forest of the Bembézar River; Construction of a footbridge over the river and improvement of difficult passageways along the path. Improvement of infrastructures for public use: Cleaning of vegetation of the existing Medieval Bridge in the Bembézar riverbed.,Medieval Bridge in the Bembézar riverbed.,)
  • Case study:Wyndham Park, Grantham  + (Adding Gravel, Berm Creation, tree management,, Public access to river,,,)
  • Case study:Rottal Burn  + (Adding sinuosity, Decrease sedimentation, Bank reprofiling,,Floodplain reconnection, Removal of embankments,,Adding sinuosity, Channel widening, ,,,)
  • Case study:River Dearne at Mexborough  + (Adding sinuosity,,Creation of backwaters,,Channel narrowing, Creation of backwater, ,Reduced maintenance,,,)
  • Case study:River Wid restoration scheme  + (Adding sinuosity,,Floodplain reconnection,,Channel narrowing, ,,,)
  • Case study:Restoration of Myllypuro brook  + (Adding sinuosity,,Re-instatement of old course ,,,)
  • Case study:Restorations of Ritobäcken brook  + (Adding sinuosity,Re-introducing stones, Introduction of gravel,,, ,,,)
  • Case study:Restoration of Kocksbybäcken brook  + (Adding sinuosity,Re-introducing stones, Introduction of gravel,,, ,,,)
  • Case study:Restoration, protection and sustainable development of protected area "Zlato pole"  + (Aforestation, Weir construction,,Creation of wetland, ,,,)
  • Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality  + (Aforestation,, ,,,)
  • Case study:Letting the Dove Flow  + (Allowing stone weirs and bank reinforcemenAllowing stone weirs and bank reinforcements to break down, removing or breaching weirs and reinforcements,, Installing large woody material,Encouraging tree growth and natural supply of large woody material,Engagement with a wide range of stakeholders - more planned.,ide range of stakeholders - more planned.,)
  • Case study:The Middle Ouse Restoration of Physical Habitats (MORPH)  + (Alteration in channel dimensions, Bank improvement, Weir removal, Rock ramp construction, Restoring gravel bed,,Creation of wet woodland, Control of invasive species,,Creation of fish passes, Meandering channel, ,,,)
  • Case study:Spring Meadow Meander Restoration  + (Alteration in channel dimensions, Bank improvement, Improvement of natural flows, Introducing large woody debris,,Creation of wet woodland,,Improvement of channel morphology, Meandering channel, ,Monitoring strategy,,,)