Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Swindale Beck Restoration + (,Adding sinuosity, Floodplain reconnection, Habitat enhancement, Diversification of in-channel features,,Channel naturalisation, ,,Community involvement, Engagement with a wide range of stakeholders, Partnerships,)
- Case study:Stage 0 channel restoration + (,Barrier removal, Channel realignment, Connection to wider floodplain,Cleaning of spawning gravels ,,,)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (,Barrier removal, Deculverting,Diversification of in-channel features, ,,Community involvement, Improved public access,,)
- Case study:Haltwhistle burn; a total catchment approach + (,Barrier removal,, Tree planting,,Manageme … ,Barrier removal,, Tree planting,,Management of organic and inorganic sediments, Improve forest management and agricultural,Awareness raising, Engagement with schools,,Community engagement, Monitoring via Fixed Point Photography, Invertebrate analysis, Electro-fishing,y, Invertebrate analysis, Electro-fishing,)
- Case study:Dorset CPAF Projects + (,Buffer strips, Floodplain reconnection,,Cut back of trees, ,,,)
- Case study:Medmerry Managed Realignment Scheme + (,Built new sea defences inland then breach … ,Built new sea defences inland then breached original shingle bank, Habitat enhancement, Drainage ditches, Reedbed creation, Creation of pond,, Constructed new freshwater outfall structures,,The Medmerry Stakeholders Advisory Group (MStAG), which includes representatives from local councils, residents’ groups, access groups and conservation organisations, guided the scheme design., organisations, guided the scheme design.,)
- Case study:Land opposite Wanstead Park + (,Bund removal, Creation of wetland, ,,,)
- Case study:Nine Chalk Rivers Project + (,Connection to wider floodplain, silt and nutrient trapping,Creation of meanders, ,,,)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (,Conservation measures and environmental i … ,Conservation measures and environmental improvement, ,Environmental integration measures and agricultural uses; Environmental integration measures and livestock uses; Environmental integration measures and tourism uses; Environmental integration measures and public uses (hunting, fishing ...).,, and public uses (hunting, fishing ...).,,)
- Case study:Lowdham NFM + (,Containment bund to prevent flooding, Tree planting, Floodplain reconnection, Deculverting,,leaky woody dams, ,,,)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (,Control of invasive species, Extensive pl … ,Control of invasive species, Extensive planting, Restoring riparian vegetation,, meintenance of the trails network, construction of infrastructure read to prevent the passage on lawns,,Realization of press conferences, Public meeting, distribution of brochures,Adherence to the system of certification of forest management, Information board erected,est management, Information board erected,)
- Case study:Restoration project of riparian buffer of the Sesia river + (,Control of invasive species; planting riparian vegetation, ,,,)
- Case study:The South Cornwall River Improvement Project - River Par + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project - St. Austell + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project - Mevagissey River + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Warleggan + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Crinnis + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Polmear stream + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Gorran Stream + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Portmellon Stream + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:The South Cornwall River Improvement Project – Bokiddicks Stream + (,Create riffle/pool,Introduction of gravel, ,,Boards-Interpretation areas will be installed to disseminate information and engage and educate local users,)
- Case study:LIFE ECORICE - Vercelli rice fields + (,Creation and/or restoration of ecological … ,Creation and/or restoration of ecological corridors; Creation and/or restoration of core areas and stepping stones, ,Forestry management for heronry conservation; Guidelines for the sustainable management of the rice agroecosystem, Guidelines for the forest management of heronries, Integrated Action Plan for rice cultivation management,Participatory process engaging local managers, users and policy makers,Scientific and social monitoringcy makers,Scientific and social monitoring)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (,Creation of an infiltration lagoon, Habitat creation,, ,,Community consultation,,)
- Case study:Kirkstall Valley Weir Fish Passes Project + (,Creation of fish passes,, ,,Community involvement,)
- Case study:Columbia Wharf + (,Creation of pond, ,,,)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (,Creation of side channel, Habitat creation,, ,Ensuring biodiversity, Reduced pollution,,Awareness raising, Environmental education activities with local schools,,)
- Case study:Houndsden Road Rain Gardens + (,Creation of swales and wetland basin, ,Opening of tree canopy to encourage varied ground flora,,Community consultation, Community involvement, Interpretation boards, Improved public access,,)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (,Creation of wet woodland, Buffer strips, ,,,)
- Case study:Craigton Riparian and NFM Orchard Planting + (,Creation of wet woodland, orchard, ,,Volunteer engagement,,)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (,Creation of wetland, ,,,)
- Case study:Boston Manor + (,Creation of wetland, ,,,)
- Case study:Hackney Marshes - Wick Field recreation ground + (,Creation of wetland, ,,,)
- Case study:Enhancements in Hampstead Heath + (,Creation of wetland, ,,,)
- Case study:Roxbourne Park + (,Creation of wetland, ,,,)
- Case study:River Shuttle Enhancement Works - Malborough Park + (,Creation of wetland, ,,,)
- Case study:Watford FC / Hospital + (,Creation of wetland, ,,,)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (,Creation of wetland, ,,,Information provision)
- Case study:Upper Mun Restoration: Frogshall Wetland Project + (,Creation of wetland, ,,Community involvement,,)
- Case study:Bury Lodge Wetlands + (,Creation of wetland, ,,Recreation, Improved public access,)
- Case study:Parish Wood Park + (,Creation of wetland, ,Woodland management,Improved public access,)
- Case study:The Barge Walk, Hampton Court + (,Creation of wetland, Habitat creation, Reedbed creation,, ,,,)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (,Creation of wetland, Recovering natural landscapes,,,)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (,Creation of wetland, Recovering natural landscapes,DPH recovery by removal of fences and barriers that restrict access to the river,,)
- Case study:Yeading Brook Fields/Meadows + (,Creation of wetland, Reedbed creation, Creation of pond,, UK BAP habitat creation/restoration,,,,)
- Case study:The Ciobarciu Wetland Project + (,Creation of wetland, Removal of embankments,,Re-instatement of old course Improvement of natural flows,,,Improved public access, Land purchase,,Consultation)
- Case study:Martins River Island + (,Creation of wetland, Removal of embankments, Riparian planting,,Introducing large woody debris, Introduction of gravel, ,,,)
- Case study:Community Wetlands + (,Creation of wetland, Scrapes, Floodplain spillways, Floodplain reconnection, water meadow creation,,Reedbed creation, ,,Community Education, Viewing platform,,Information provision)
- Case study:Wandle Valley Wetlands + (,Creation of wetland, Tree management,Creation of backwater ,,,)
- Case study:River restoration and flood alleviation on the River Brain at Witham + (,Creation of wetland,,Back channel created ,,,Community engagement,)
- Case study:County Gardens, Mayes Brook + (,Creation of wetland,Creation of backwater ,,,)