Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Beekherstel Zuidelijk Afwateringskanaal + (1 - 10 m³/s)
- Case study:Beekherstel Eefsebeek + (1 - 10 m³/s)
- Case study:Restoration of the river Akerselva + (1 - 10 m³/s)
- Case study:Restoration of Grobruelva + (1 - 10 m³/s)
- Case study:Kanaal van Deurne + (1 - 10 m³/s)
- Case study:Midden Regge + (1 - 10 m³/s)
- Case study:Beneden Regge + (1 - 10 m³/s)
- Case study:De Doorbraak + (1 - 10 m³/s)
- Case study:Tungelroyse Beek (Downstream) + (1 - 10 m³/s)
- Case study:Isar-Plan + (10 - 100 m³/s)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (10 - 100 m³/s)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (10 - 100 m³/s)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (10 - 100 m³/s)
- Case study:Rheinfelden bypass + (10 - 100 m³/s)
- Case study:River Ebbw Bank Stabilisation + (10 - 100 m³/s)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (10 - 100 m³/s)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (10 - 100 m³/s)
- Case study:The San Marcos weir removal + (10 - 100 m³/s)
- Case study:La Gotera dam removal + (10 - 100 m³/s)
- Case study:Fish pass on the Najerilla River + (10 - 100 m³/s)
- Case study:Restoring the natural dynamics of the upper Adour + (10 - 100 m³/s)
- Case study:Removal of the Ver mill weir on the Sienne River + (10 - 100 m³/s)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (10 - 100 m³/s)
- Case study:Effacement du seuil de Carayon sur le Thoré + (10 - 100 m³/s)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (10 - 100 m³/s)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (10 - 100 m³/s)
- Case study:Boven-Dommel + (10 - 100 m³/s)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (10 - 100 m³/s)
- Case study:Amerongse Bovenpolder + (100 - 1000 m³/s)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (100 - 1000 m³/s)
- Case study:Restoration of Oulujoki River + (100 - 1000 m³/s)
- Case study:Keent + (100 - 1000 m³/s)
- Case study:Timber float restorations at River Iijoki + (100 - 1000 m³/s)
- Case study:Restoration of side channels of the Loire and its tributaries + (100 - 1000 m³/s)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (100 - 1000 m³/s)
- Case study:Welton Farm Landfill/Riverbank Works + (100 - 1000 m³/s)
- Case study:Off-Channels Restauration + (Less than 0.1 m³/s)
- Case study:Černý potok stream restoration scheme + (Less than 0.1 m³/s)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Less than 0.1 m³/s)
- Case study:Ddu Restoration Project + (Less than 0.1 m³/s)
- Case study:Gilev's Grove reconstruction + (Less than 0.1 m³/s)
- Case study:Hierdense Beek + (Less than 0.1 m³/s)
- Case study:Traditioneel Beekherstel Koffiegoot + (Less than 0.1 m³/s)
- Case study:Beekherstel Lactariabeek + (Less than 0.1 m³/s)
- Case study:Lactariabeek + (Less than 0.1 m³/s)
- Case study:Osink-Bemersbeek + (Less than 0.1 m³/s)
- Case study:Springendalse Beek + (Less than 0.1 m³/s)
- Case study:Upper Cringle Floodplain Restoration Project + (Less than 0.1 m³/s)
- Case study:Blauwe Kamer + (more than 1000 m³/s)
- Case study:Conservation of alluvial + (more than 1000 m³/s)
- Case study:Rheinauen bei Rastatt + (more than 1000 m³/s)
- Case study:The Babina Restoration Project + (more than 1000 m³/s)
- Case study:The Cernovca Restoration Project + (more than 1000 m³/s)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (more than 1000 m³/s)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (more than 1000 m³/s)
- Case study:Creating a fishpass at Włocławek dam + (more than 1000 m³/s)