Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Teglverksdammen + (Reduced pollution)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Reduced water abstractions)
- Case study:Saving Chiswick Eyot + (Reducing bank side collapse (source of sediment))
- Case study:Carnon River: Abandoned Metal Mines + (Remediation Treatment)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:West Allen: Abandoned Metal Mines + (Remediation Treatment)
- Case study:Giving up the Weed + (Removal of invasive species)
- Case study:Soaring connections: restoring people, wildlife & place + (Removal of invasive species)
- Case study:Restoration of Grobruelva + (Removal of litter (especially car tires))
- Case study:Odder Stream Restoration + (Removed 25 drain systems and 7 ditches)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Replacement of nozzles of greater diameter and calibration of them to ensure continuity of the slope and reloaded in coarse aggregates)
- Case study:Removal of the Brosses weir on the Soanan River + (Rescue fishing campaign)
- Case study:River Rea Restoration Project + (Riparian Management to increase the amount of light getting through the canopy)
- Case study:Upper River Nairn restoration project + (Riparian tree planting)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Management of undesirable plant species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Management of undesirable plant species)
- Case study:Chinbrook Meadows Wetlands + (Planting wildflower mixes)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Cutting trees that could be a potential danger)
- Case study:Bow Brook Living Landscape + (Arable reversion to wildflower meadow)
- Case study:Tittesworth Catchment Project + (Training events)
- Case study:Roe and Ive + (Land management)
- Case study:Rookery Brook Pollution Prevention Project + (Land management)
- Case study:Hills to Levels + (Soil managment and land use to improve infiltration and water quality)
- Case study:Gunnerside Gill: Abandoned metal mines + (Spot flow gauging)
- Case study:The Irfon Special Area of Conservation Project + (Stocking)
- Case study:Lugg & Arrow, Radnorshire + (Supporting local fisheries through marketing initiatives)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Grants from the Administration)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock exclusion)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (The banks are maintained if necessary by vegetal engineering)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The banks are not not stabilized in order to let the stream create its preferential flow channel and facilitate overflows in the meadow with each rising water)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (The level of the water bodies is lowered during two months in summer and are completely drained every three to five years.)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning.)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Before the works)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (The work was carried out dry by temporary diversion of the watercourse (cofferdam)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Town hall workers)
- Case study:Tittesworth Catchment Project + (Training events)
- Case study:River Alt at Knowsley + (Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Vegetation management plan;)
- Case study:Minsterley Brook Abandoned Metal Mines + (Walkover surveys and water sample data collection)
- Case study:Love My River + (Walkover surveys and water sample data collection)
- Case study:Sediment Pathways Project + (Walkover surveys and water sample data collection)
- Case study:Healthy Rivers + (Walkover surveys and water sample data collection)
- Case study:Isar-Plan + (Waste management)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Watersupply for Natura 2000 habitats)
- Case study:Voorste Nete at Dessel + (Weed clearance)
- Case study:Parish Wood Park + (Woodland management)
- Case study:Ironbridge Farm + (Ensuring biodiversity)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Improvement of agri-environmental practice … Improvement of agri-environmental practices; Establish a protocol for the use of the ditches of the Sueca Irrigators Community to connect the Sueca irrigation system to the lagoon out of the rice growing season; The approval of the legal management instruments: plans related to the Water Framework Directive (Júcar River Basin Plan) and the Nature Directives (Natura 2000 SAC); the maintenance of the productivity of the agricultural system and the actions to deal with salinization and the negative effects of climate change on cropsegative effects of climate change on crops)