Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Reopening and restoration of the stream Hovinbekken + (Reduced pollution)
- Case study:Restoration of the river Børselva + (Reduced pollution)
- Case study:Teglverksdammen + (Reduced pollution)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Reduced water abstractions)
- Case study:Saving Chiswick Eyot + (Reducing bank side collapse (source of sediment))
- Case study:Carnon River: Abandoned Metal Mines + (Remediation Treatment)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:Sharnberry Mine: Abandoned Metal Mines + (Catchment Characterisation Programme to investigate water pollution from abandoned metal mines and determine remediation options of metal pollution)
- Case study:West Allen: Abandoned Metal Mines + (Remediation Treatment)
- Case study:Giving up the Weed + (Removal of invasive species)
- Case study:Soaring connections: restoring people, wildlife & place + (Removal of invasive species)
- Case study:Restoration of Grobruelva + (Removal of litter (especially car tires))
- Case study:Odder Stream Restoration + (Removed 25 drain systems and 7 ditches)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Replacement of nozzles of greater diameter and calibration of them to ensure continuity of the slope and reloaded in coarse aggregates)
- Case study:Removal of the Brosses weir on the Soanan River + (Rescue fishing campaign)
- Case study:River Rea Restoration Project + (Riparian Management to increase the amount of light getting through the canopy)
- Case study:Upper River Nairn restoration project + (Riparian tree planting)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Management of undesirable plant species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Management of undesirable plant species)
- Case study:Chinbrook Meadows Wetlands + (Planting wildflower mixes)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Cutting trees that could be a potential danger)
- Case study:Bow Brook Living Landscape + (Soil Health Plan)
- Case study:Tittesworth Catchment Project + (Training events)
- Case study:Roe and Ive + (Land management)
- Case study:Rookery Brook Pollution Prevention Project + (Land management)
- Case study:Hills to Levels + (Soil managment and land use to improve infiltration and water quality)
- Case study:Gunnerside Gill: Abandoned metal mines + (Catchment Characterisation Programme)
- Case study:The Irfon Special Area of Conservation Project + (Stocking)
- Case study:Lugg & Arrow, Radnorshire + (Supporting local fisheries through marketing initiatives)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Grants from the Administration)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock exclusion)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (The banks are maintained if necessary by vegetal engineering)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The banks are not not stabilized in order to let the stream create its preferential flow channel and facilitate overflows in the meadow with each rising water)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (The level of the water bodies is lowered during two months in summer and are completely drained every three to five years.)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning.)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Before the works)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (The work was carried out dry by temporary diversion of the watercourse (cofferdam)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Town hall workers)
- Case study:River Alt at Knowsley + (Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Vegetation management plan;)
- Case study:Minsterley Brook Abandoned Metal Mines + (Walkover surveys and water sample data collection)
- Case study:Love My River + (Walkover surveys and water sample data collection)
- Case study:Sediment Pathways Project + (Walkover surveys and water sample data collection)
- Case study:Healthy Rivers + (Walkover surveys and water sample data collection)
- Case study:Isar-Plan + (Waste management)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Watersupply for Natura 2000 habitats)