Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Pearls in Peril LIFE+ GB Project - River South Esk + (Land management)
- Case study:Rookery Brook Pollution Prevention Project + (Land management)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Land management)
- Case study:Soaring connections: restoring people, wildlife & place + (Removal of invasive species)
- Case study:Roe and Ive + (Land management)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Landsteward agreement)
- Case study:River restoration in the irrigation area Lobón (Badajoz) +
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Limitation of access to the river; conservation of mobility area)
- Case study:Friends of Afon Llwyd (FOAL) + (Litter picking)
- Case study:Restoring Brent Rivers and Communities + (Litter picking)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock exclusion)
- Case study:The Wye & Usk Passport + (Made rivers more accessible to fishermen)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Clearing of alluvial terraces)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Maintenance of anchorages and other structures)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (Maintenance plan for revegetation of burned area)
- Case study:Wallasea (North) Managed Realignment + (Managed realignment)
- Case study:Freiston Managed Realignment Scheme + (Managed realignment (Three 50m wide breaches were created in the outer sea wall))
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Management for increase species like Lepus europaeus)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Management in coordination with livestock operators)
- Case study:River Kennet Restoration at Durnsford + (Management of organic and inorganic sediments)
- Case study:Haltwhistle burn; a total catchment approach + (Management of organic and inorganic sediments)
- Case study:Rio Tepice urban restoration + (Management of paths)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Management of undesirable plant species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Management of undesirable plant species)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Management of vegetation)
- Case study:Černý potok stream restoration scheme + (Management of vegetation)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (Adjusting discharges and creating a monophogenetic discharge)
- Case study:LIFE Saramugo + (Implementation of a Nature Custody network for the Saramugo)
- Case study:The San Marcos weir removal + (Materials removed from the weir were used to fill the pool produced downstream the weir)
- Case study:River Don Restoration project + (Misconnections campaign)
- Case study:Beverley Brook Flow control structures + (Modelling)
- Case study:Valtellina 2005 – New green system + (Monitoring strategy)
- Case study:Timber float restorations at River Iijoki + (Monitoring strategy)
- Case study:HPP Blanca + (Monitoring strategy)
- Case study:Skjern River Project + (Monitoring strategy)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Monitoring strategy)
- Case study:Mayesbrook Climate Change Park restoration project + (Monitoring strategy)
- Case study:Černý potok stream restoration scheme + (Monitoring strategy)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Monitoring strategy)
- Case study:Spring Meadow Meander Restoration + (Monitoring strategy)
- Case study:Beverley Brook Flow control structures + (Monitoring strategy)
- Case study:Improving conservation condition of the National Trust managed river test SSSI + (Monitoring strategy)
- Case study:Healthy Rivers + (Monitoring strategy)
- Case study:Letting the Dove Flow 2 + (Monitoring strategy)
- Case study:Broadwater Brook + (Monitoring strategy)
- Case study:Bird reserve “Los Albardales” (Madrid) + (Monitoring the species of birds)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (More natural reservoir releases)
- Case study:Beneden-Leeuwen-Side channel + (More natural water retention)
- Case study:Černý potok stream restoration scheme + (Management of vegetation)
- Case study:Stroud Rural Sustainable Drainage Project + (Fencing)
- Case study:South Esk restoration + (More sensitive channel maintenance)
- Case study:Test and Itchen River Restoration Strategy + (More sensitive channel maintenance)
- Case study:Old Station Beat restoration, River Test at Bossington + (More sensitive channel maintenance)
- Case study:River Skerne- Life project + (More sensitive floodplain maintenance)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (More sensitive floodplain maintenance)
- Case study:Lippeaue Klostermersch + (More sensitive grazing)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Quiet zone establishment (fishing is forbiden)
- Case study:Hierdense Beek + (Mowing management)
- Case study:River Bure + (No longer remove naturally occurring LWD)
- Case study:Diffusing the Issue in rural Ribble + (Fencing)
- Case study:The Pow Beck Improvement Project + (Non/agricultural business changed its way of working)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Fencing)
- Case study:Upper Welland Water Friendly Farming Project + (Fencing)