Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Salmon Conservation + (Banning of bait fishing on the Wye)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Before the works)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Replacement of nozzles of greater diameter and calibration of them to ensure continuity of the slope and reloaded in coarse aggregates)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (CTM management guidelines)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Management for increase species like Lepus europaeus)
- Case study:Robledo de Chavela dam removal + (Capture and transfer of fish)
- Case study:Salmon Conservation + (Catch and release scheme)
- Case study:Gunnerside Gill: Abandoned metal mines + (Catchment Characterisation Programme)
- Case study:Barney Beck: Abandoned Metal Mines + (Catchment Characterisation Programme to investigate water pollution from abandoned metal mines and determine remediation options of metal pollution)
- Case study:Sharnberry Mine: Abandoned Metal Mines + (Catchment Characterisation Programme to investigate water pollution from abandoned metal mines and determine remediation options of metal pollution)
- Case study:Restoring the natural dynamics of the upper Adour + (Countering the development of Japanese knotweed)
- Case study:Upper Witham Restoration + (Changes to floodplain management practice)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Channels)
- Case study:Gategill Beck: Abandoned Metal Mines + (Clean up pollution with Defra funding)
- Case study:Love My River + (Walkover surveys and water sample data collection)
- Case study:Broadwater Brook + (Agricultural business changed its way of working)
- Case study:Environmental regeneration project in Magro river bed + (Cleaning channels)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Clearing of alluvial terraces)
- Case study:Watercress Farm Rewetting Project + (Confined works traffic to designated haul road routes to minimize impact on local habitats and species)
- Case study:Stainby Road, Colsterworth + (Conservation grazing)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Contract of Resurgences (multilevel governance tool))
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Create a dynamic model of active participation of farmers in land management)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Creation of a fishing reserve and legal establishment of a recreational fishing zone in the Melides Lagoon; Creation of a local multi-stakeholder association - agriculture)
- Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain + (Custody agreements)
- Case study:Regeneration of the banks of the river Mape + (Custody of territory)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Cutting trees that could be a potential danger)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (DPH recovery by removal of fences and barriers that restrict access to the river)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (DPH recovery by removal of fences and barriers that restrict access to the river)