Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Colliers Row + (O’Shea)
- Case study:Haynes Park + (O’Shea)
- Case study:Raphael Park + (O’Shea)
- Case study:Chase Nature Reserve + (O’Shea)
- Case study:LIFE ECORICE - Vercelli rice fields + (Pagano)
- Case study:Restoration project of riparian buffer of the Sesia river + (Pagano)
- Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain + (Pagano)
- Case study:LIFE08NAT/IT/000352 CRAINat + (Pagliani)
- Case study:LIFE08NAT/IT/000352 CRAINat 2 + (Pagliani)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Pardolesi)
- Case study:Removal of the Cussy weir on the Maria stream + (Paris)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Paris)
- Case study:Shoreham Harbour Shingle Bypassing and Recycling + (Parker)
- Case study:Upper River Witham : Easton + (Parr)
- Case study:River Witham Great Ponton + (Parr)
- Case study:Wyndham Park, Grantham + (Parr)
- Case study:Manthorpe Floodplain Reconnection + (Parr)
- Case study:Syston and Barkston Restoration + (Parr)
- Case study:Aubourn Rock Ramp and Habitat Works + (Parr)
- Case study:Westborough + (Parr)
- Case study:Little Ponton + (Parr)
- Case study:Water and Life for Drava and Vuka + (Parrag)
- Case study:Gilev's Grove reconstruction + (Pavluk)
- Case study:Tanners Brook + (Peacock)
- Case study:Minsterley Brook Abandoned Metal Mines + (Pearson)
- Case study:Barn Elms Wetland Centre, South West London + (Peberdy)
- Case study:Bocq river (Walphy - LIFE project) + (Peeters)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Peeters)
- Case study:Restoration of Siuruanjoki River + (Pehkonen)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Peress)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Peress)
- Case study:Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park + (Perez-Linde)
- Case study:Diversion of the River Nith + (Perfect)
- Case study:Pow Burn Restoration Project + (Perfect)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (Perin)
- Case study:Glaisdale Beck diversion scheme + (Perks)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Perraudin)
- Case study:River Glyme Stratford Restoration + (Phillips)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Pietra)
- Case study:ReNaturalize + (Pinto)
- Case study:Restoring Brent Rivers and Communities + (Pinto)
- Case study:Rewilding the Rom + (Pinto)
- Case study:Love Your River Telford + (Pluckwell)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (Pognart)
- Case study:Fishery/habitat enhancement on the Grand Union Canal + (Pomeroy)
- Case study:Uxbridge Moor Backwater + (Pomeroy)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Ponsonnaille)
- Case study:Elgin Flood Alleviation Scheme + (Pope)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Porter)
- Case study:Charlton St Peter A 8 + (Porter)
- Case study:France Farm (Phase 1) A 9 + (Porter)
- Case study:Longstreet A 91a + (Porter)