Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Wensum Restoration, Reach 9 Attlebridge + (Butcher)
- Case study:Valtellina 2005 – New green system + (Buzzetti)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Bäckstrand)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Bäckstrand)
- Case study:Bosgården nature-like fishway at River Rolfså + (Bäckstrand)
- Case study:Apelnäs fishway at River Rolfså + (Bäckstrand)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Bäckstrand)
- Case study:Restorations of River Nolån-Hulta dam removal + (Bäckstrand)
- Case study:´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant + (Bäckstrand)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (Bäckstrand)
- Case study:Restoration project in Turia River + (C.H.Júcar)
- Case study:Restoration project in Verde River + (C.H.Júcar)
- Case study:Environmental regeneration project in Magro river bed + (C.H.Júcar)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (CHDuero)
- Case study:Restoration in the lower reach of the Cinca River + (CHE)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (CHGuadiana)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (CHGuadiana)
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (CHGuadiana)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (CHGuadiana)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (CHJ)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (CHTajo)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (CHTajo)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (CHTajo)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (CHTajo)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (CHTajo)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Cadel, Bonnet)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Carter)
- Case study:Pearls in Peril LIFE+ GB Project - River Naver + (Casey)
- Case study:Pearls in Peril LIFE+ GB Project - River Evelix + (Casey)
- Case study:Pearls in Peril LIFE+ GB Project - River Oykel + (Casey)
- Case study:Pearls in Peril LIFE+ GB Project - River Borgie + (Casey)
- Case study:Pearls in Peril LIFE+ GB Project - Mingary Burn + (Casey)
- Case study:Environmental Restoration of the Lower Section of the Bembézar River and its River Environment (Phase 1) + (Castañeda)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (Castañeda)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Castañeda)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (Castañeda)
- Case study:Seven Kings Water + (Castro)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Catroux)
- Case study:Restoring the natural dynamics of the upper Adour + (Cazaux)
- Case study:Oasi naturale delle pittime di Cascina Oschiena + (Cerutti)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Challis)
- Case study:Mill Road Weir + (Challis)
- Case study:Cranford Park Phase 2 + (Challis)
- Case study:Yeading Brook fields - Reedbed creation + (Challis)
- Case study:Welton Farm Landfill/Riverbank Works + (Chalmers)
- Case study:Sheephouse Wood Mine Water Treatment Scheme + (Chamberlain)
- Case study:Cornmill Gardens (QUERCUS) + (Chapman)
- Case study:QUERCUS Ravensbourne + (Chapman)
- Case study:Ladywell Fields (QUERCUS) + (Chapman)
- Case study:ERCIP - European River Corridor Improvement Plans + (Chapman)
- Case study:Poyle channel enhancement and weir removal + (Chapman)
- Case study:Marsh restoration on the Merlue + (Chaput)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (Charrier)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Charrier)
- Case study:Wensum River Restoration and Floodplain Enhancement, Pensthorpe + (Chase)