Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Moor Lane Allotments + (Marie-Claire)
- Case study:Habitat measures Hollundbekken + (Marius)
- Case study:River Nar Restoration Project + (Mark)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (Mark)
- Case study:River Tame at Salford Park ("SMURF") + (Mark)
- Case study:SMURF Tame + (Mark)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Mark)
- Case study:Parish Wood Park + (Mark)
- Case study:Essex Healthy Headwaters River Restoration Project + (Mark)
- Case study:Ballinderry Freshwater Pearl Mussel Rescue Project + (Mark)
- Case study:River Glaven, North Norfolk + (Mark)
- Case study:The Bowmont Catchment + (Mark)
- Case study:Restoration of Reinikkalankoski torrent + (Markus)
- Case study:Wild Wylye Phase 1 + (Martijn)
- Case study:Gunville Phase I + (Martijn)
- Case study:West Amesbury + (Martijn)
- Case study:River Cole- Life Project + (Martin)
- Case study:River Rhee + (Martin)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Martin)
- Case study:River restoration: Benefits for integrated catchment management + (Martin)
- Case study:Saving Chiswick Eyot + (Martin)
- Case study:'t Merkske + (Martin)
- Case study:Oude Leij + (Martin)
- Case study:Bijloop + (Martin)
- Case study:LIFE IP IRIS Enns Mandling Restoration + (Martin)
- Case study:Tolka Valley Park at Finglas + (Maryann)
- Case study:Tolka Valley Park at Finglas 2 + (Maryann)
- Case study:Tolka Valley Park at Finglas 3 + (Maryann)
- Case study:Tolka Valley Park erosion control + (Maryann)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Massimo)
- Case study:Albany Park + (Matilda)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Matt)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Matt)
- Case study:River Colne Riparian Tree Planting + (Matt)
- Case study:Nobles Green Ditch River Restoration + (Matt)
- Case study:River Can Backwater Restoration + (Matt)
- Case study:Upper River Witham : Easton + (Matt)
- Case study:River Witham Great Ponton + (Matt)
- Case study:Wyndham Park, Grantham + (Matt)
- Case study:Manthorpe Floodplain Reconnection + (Matt)
- Case study:Syston and Barkston Restoration + (Matt)
- Case study:Aubourn Rock Ramp and Habitat Works + (Matt)
- Case study:Westborough + (Matt)
- Case study:Little Ponton + (Matt)
- Case study:Sydenham Cottages Nature Reserve + (Matthew)
- Case study:Mottingham Farm + (Matthew)
- Case study:Colfes School + (Matthew)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (Matthew)
- Case study:Glaisdale Beck diversion scheme + (Matthew)
- Case study:Greatham Marsh Restoration + (Matthew)
- Case study:Isar-Plan + (Matthias)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Matthias)
- Case study:LIFE+ “Sipontine Wetlands” + (Maurizio)
- Case study:Reopening of the culverted Redon river + (Maxime)
- Case study:New Forest Life III project + (Maxine)
- Case study:Upper Emscher + (Mechthild)
- Flood detention basin (HRB) Ickern-Mengede + (Mechthild)
- Case study:Seseke Remodelling + (Mechthild)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Mel)
- Case study:Yeading Brook fields - Reedbed creation + (Mel)
- Case study:River Trent, Bucknall Park + (Mel)
- Case study:Mill Road Weir + (Melanie)
- Case study:Cranford Park Phase 2 + (Melanie)