Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rodley weir by pass channel + (Dr Turner)
- Case study:The restoration of the Sotovo lake: Volga-Akhtuba floodplain + (Dzolotaryov)
- Flood detention basin (HRB) Ickern-Mengede + (EGLV)
- Case study:Seseke Remodelling + (EGLV)
- Case study:Upper Emscher + (EGLV)
- Case study:Hills to Levels + (FWAGSW-H2L)
- Case study:Bathgate Watercourse Restoration Project + (Forth Fisheries Trust)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Francis Hayes)
- Case study:TerraSeixe + (GEOTA)
- Case study:Castle Irwell Urban Wetland + (Gjmorris)
- Case study:Goshen Weir removal project, River Roch, Bury + (Gjmorris)
- Case study:River Adur - Shipley weir removal + (Glwilliams)
- Case study:Bow Brook Floodplain Restoration + (Gmatthews)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (H)
- Case study:Bristol Frome Diffuse Pollution Project + (H.alv)
- Case study:Wellow Brook Habitat Enhancement Project + (H.alv)
- Case study:SHerston River IMProvement (SHRIMP) Project + (H.alv)
- Case study:Force Crag Mine Remediation + (HPotter)
- Case study:Saltburn Gill ironstones mines + (HPotter)
- Case study:Haltwhistle burn; a total catchment approach + (Halty)
- Case study:Ribble Life Together + (Harveyht)
- Case study:Tichborne River Restoration Project + (Hbarclay)
- Case study:Test and Itchen River Restoration Strategy 2 + (Heb leman)
- Case study:River Glyme Stratford Restoration + (Hilary Phillips)
- Case study:Friends of Bottesford Beck + (Hilary Strong)
- Case study:Ddu Restoration Project + (Huw Jones)
- Case study:Marine Colliery river blockage + (Hywel Abbott)
- Case study:Mill Road Weir, Pontypool + (Hywel Abbott)
- Case study:Healthy Rivers + (Hywel Abbott)
- Case study:Whit Beck River Restoration Project + (Ian Creighton)
- Case study:Afon Merin Natural Process Restoration + (Ieuan)
- Case study:Amerongse Bovenpolder + (InfoMan)
- Case study:Blauwe Kamer + (InfoMan)
- Case study:Aston Clinton River Restoration + (Jdippie)
- Case study:Ecclesbourne Farm project + (Jfreeborough)
- Case study:Fairham Brook Restoration Project + (Jfreeborough)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Jfreeborough)
- Case study:River Soar fish refuge and wetland scrape + (Jfreeborough)
- Case study:River Meden response to diffuse pollution + (Jfreeborough)
- Case study:Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria + (Joanne Backshall)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (JoanneBackshall)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (JoanneBackshall)
- Case study:Eden Crayfish Restoration Project + (Joannebackshall)
- Case study:Day Brook Rain Gardens + (John Brewington)
- Case study:Day Brook Restoration - Gedling + (John Brewington)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Josee Peress)
- Case study:Emmanuel’s Common Reconnection Project + (JoshRRC)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (JoshRRC)
- Case study:River Burn, North Creake + (JoshRRC)
- Case study:River Nar, Mileham River Restoration Project + (JoshRRC)
- Case study:River Mease Waterside Care + (JoshRRC)