Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Avon Our Water Environment + (CBec Eco Engineering)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Tragsatec)
- Case study:Restoration of the stream of the Partido + (Tragsatec)
- Case study:Recovery of the functionality of Brazo de la Torre + (Tragsatec)
- Case study:Recovery "CañoTravieso" + (Tragsatec)
- Case study:Lowdham NFM + (Trent Rivers Trust)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Danube Delta National Institute)
- Case study:Haltwhistle burn; a total catchment approach + (Tyne Rivers Trust)
- Case study:River Don Restoration project + (River Restoration Centre)
- Case study:Vindel River LIFE + (Umeå University)
- Case study:Voorste Nete at Dessel + (University Hasselt)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (University of Bologna)
- Case study:Spring Meadow Meander Restoration + (Royal HaskoningDHV)
- Case study:Diversion of the River Nith + (Halcrow)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Université de Franche-Comté)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Unión Fenosa S.A.)
- Case study:Restoration of Grobruelva + (Vannområdet Indre Oslofjord Vest)
- Case study:Environmental regeneration project in Magro river bed + (Vielca Ingenieros S.A.)
- Case study:Welland for People and Wildlife Project +
- Case study:South Calder Water deculverting and habitat restoration + (Scottish Environment Protection Agency (SEPA))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (WSP/CBEC)
- Case study:Regelsbrunner Aue + (WWF Austria)
- Case study:Conservation of alluvial + (WWF Hungary, Danube-Drava National Park Directorate, Municipality of Mohács town)
- Case study:Agreed definition of mobility area for the Adour + (Water Agency)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Water Agency)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Water Agency)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Water Agency)
- Case study:Restoration of the previous riverbed of the Dadon + (Water Agency)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Water Agency)
- Case study:Beekherstel Lactariabeek + (Waterschap Aa en Maas)
- Case study:Klassiek beekherstel Astense Aa + (Waterschap Aa en Maas)
- Case study:Beek Lage Raam + (Waterschap Aa en Maas)
- Case study:Herinrichting beekdal Tongelreep + (Waterschap De Dommel)
- Case study:Day Brook Restoration - Gedling + (Groundwork Greater Nottingham)
- Case study:Ennerdale Mill Weir Removal + (West Cumbria Rivers Trust)
- Case study:Improving the structure of the Lahn-patak in Hungary + (SOLVEX LTD)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (West-Transdanubian Water Management Directorate)
- Case study:River Avon Habitat Enhancement, Fifield + (Wild Trout Trust)
- Case study:Manthorpe Floodplain Reconnection + (Environement Agency)
- Case study:Wild Wylye Phase 1 + (Wiltshire Wildlife Trust)
- Case study:Cudworth dyke restoration project + (Yorkshire Water)