Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Dulais Restoration Project + (Salix)
- Case study:Upper River Nairn restoration project + (cbec eco-engineering UK Ltd)
- Case study:River Cole Restoration + (Environement Agency)
- Case study:South Calder Water deculverting and habitat restoration + (Scottish Environment Protection Agency (SEPA))
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Societat de Pescadors d'Alòs de Balaguer)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (West-Transdanubian Water Management Directorate)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (South Transdanubian Regional Development Council and Agency)
- Case study:Revitalisation of branches ’Boros Dráva and Drávakeresztúri’ + (South-Transdanubian Environment Protection and Water Management Directorate)
- Case study:Rinya water-system reconstruction + (South-Transdanubian Environmental Protection and Water Management Directorate)
- Case study:Test and Itchen River Restoration Strategy + (Environment Agency/ Geodata/ Atkins)
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency/ Geodata)
- Case study:Allt Lorgy River Restoration + (CBec Eco Engineering)
- Case study:River Calder Large Wood Structure installation + (Spey Catchment Initiative)
- Case study:River Avon Our Water Environment + (CBec Eco Engineering)
- Case study:Lippeaue Klostermersch + (Staatliches Umweltamt Lippstadt)
- Case study:Buiten Ooij + (Staatsbosbeheer)
- Case study:Isar-Plan + (State Office for Water Management Munich)
- Case study:Stroud Rural Sustainable Drainage Project + (Stroud District Council)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (100 - 500)
- Case study:Rio Tepice urban restoration + (Studio Blanchard-Gallo)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Syndicat mixte pour le SAGE de la Canche)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Séd-Nádor 2009 Consortium)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (TALHER, S.A.)
- Case study:Craigton Riparian and NFM Orchard Planting + (TCV and CRESS)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (TECONSA (Tecnología de la Construcción, SA))
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (Notranjska Regional Park)
- Case study:Hampton Court Palace + (Historic Royal Palace, Thames Landscape Strategy)
- Case study:River Pool Linear Park Enhacement + (Thames21)
- Case study:Hampton Court Palace + (Thames21)
- Case study:Saving Chiswick Eyot + (Thames21)
- Case study:Rewilding the Rom + (Thames21)
- Case study:Chinbrook Meadows Wetlands + (Thames21)
- Case study:The Babina Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Cernovca Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Fortuna Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Holbina-Dunavat Restoration Project + (The Danube Delta National Institute for Research and Development, Tulcea)
- Case study:Logie Burn Restoration Project + (The James Hutton Institute)
- Case study:River Avon Our Water Environment + (CBec Eco Engineering)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Tragsatec)
- Case study:Restoration of the stream of the Partido + (Tragsatec)
- Case study:Recovery of the functionality of Brazo de la Torre + (Tragsatec)
- Case study:Recovery "CañoTravieso" + (Tragsatec)
- Case study:Lowdham NFM + (Trent Rivers Trust)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Danube Delta National Institute)
- Case study:Haltwhistle burn; a total catchment approach + (Tyne Rivers Trust)
- Case study:River Don Restoration project + (River Restoration Centre)
- Case study:Vindel River LIFE + (Umeå University)
- Case study:Voorste Nete at Dessel + (University Hasselt)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (University of Bologna)
- Case study:Spring Meadow Meander Restoration + (Royal HaskoningDHV)
- Case study:Diversion of the River Nith + (Halcrow)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Université de Franche-Comté)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Unión Fenosa S.A.)