Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Glaven conservation group + (Environment Agency)
- Case study:River Roding at Ray Lodge Park + (Environment Agency)
- Case study:Wensum River Restoration Strategy + (Environment Agency)
- Case study:Short Heath Brook Project + (Birmingham City Council/ Environment Agency)
- Case study:Ouzel habitat improvement + (Environment Agency)
- Case study:Enhancement of the River Crouch following a pollution incident + (Environment Agency)
- Case study:Adams Mill enhancements + (Environment Agency)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Environment Agency)
- Case study:Sculthorpe Moor Restoration Scheme + (Environment Agency)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Royal HaskoningDHV)
- Case study:Stony Stratford Sluice bank repairs + (Environment Agency)
- Case study:Test and Itchen River Restoration Strategy + (Environment Agency/ Geodata/ Atkins)
- Case study:Old Station Beat restoration, River Test at Bossington +
- Case study:Woughton on the Green bank stabilization + (Environment Agency)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Environment Agency)
- Case study:River restoration on the River Brett at Shelley + (Environment Agency)
- Case study:River Adur - Shipley weir removal + (Environment Agency)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Environment Agency)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (Environment Agency)
- Case study:Stony Stratford Sluices Bypass Channel + (Fishtek Consulting)
- Case study:Swindale Beck Restoration + (Environment Agency)
- Case study:Southington River Restoration Project + (Environment Agency)
- Case study:Test and Itchen River Restoration Strategy 2 + (Environment Agency)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Environment Agency)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Royal HaskoningDHV)
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency/ Geodata)
- Case study:Test and Itchen River Restoration Strategy + (Environment Agency/ Geodata/ Atkins)
- Case study:River Wensum Rehabilitation Project - Bintree + (Environment Ahgency)
- Case study:Millfield Plantation 2 + (Ess)
- Case study:Little Waltham Meadows Back Channel creation + (Essex Wildlife Trust)
- Case study:Bocking Blackwater River Restoration + (Essex Wildlife Trust)
- Case study:Ironbridge Farm + (Essex Wildlife Trust)
- Case study:Removal of the Fatou dam on the Beaume river + (Etablissement public de Loire)
- Case study:Holnicote multi-objective flood risk management demonstration project + (National Trust)
- Case study:Langonnet river + (Fishermen (20%))
- Case study:Restoration of Longinoja brook + (Finnish Environment Institute)
- Case study:HPP Blanca + (Fisheries Research Institute of Slovenia)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Fishtek Consulting)
- Case study:Stony Stratford Sluices Bypass Channel + (Fishtek Consulting)
- Case study:Valtellina 2005 – New green system + (Forest Service - Sondrio County)
- Case study:HLS New Forest + (Forestry Commission)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Fundación Naturaleza y Hombre)
- Case study:Restoring the River Doquette to its original bed + (Fédération de la Manche pour la pêche et la protection du milieu aquatique)
- Case study:Off-Channels Restauration + (Fédération des Hautes Alpes pour la pêche et la protection du milieu aquatique)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (General council of Eure and Lafosse &Fils SARL)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Geolittomer, Université de Nantes (Régis Barraud))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (WSP/CBEC)
- Case study:Vallacuera Ravine. Removal of a dyke + (Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.)
- Case study:Restoration of riparian zone in Aragon River + (Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.)
- Case study:Chinbrook Meadows Wetlands + (London Borough of Lewisham)
- Case study:RESTORATION OF THE TRESENEC STREAM + (Notranjska Regional Park)