Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency/ Geodata)
- Case study:River Bulbourne at Boxmoor Weir Removal + (Box Moor Trust)
- Case study:Habitat measures Hollundbekken + (Bømlo municipality)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (C.H. Cantábrico)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (C.H. Cantábrico)
- Case study:Weir demolition in river Nansa, Cantabria + (C.H. Cantábrico)
- Case study:River restoration project in Sella, Asturias + (C.H.Cantábrico)
- Case study:Restoration of the marsh "Gallega" + (C.H.Guadalquivir)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (C.H.Guadalquivir)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (Jogosa Obras y Servicios, S.L.)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (SEFOEX, S.A.)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (C.H.Júcar)
- Case study:Restoration project in Turia River + (C.H.Júcar)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (C.H.Tajo)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (C.H.Tajo)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (C.H.Tajo)
- Case study:Allt Lorgy River Restoration + (CBec Eco Engineering)
- Case study:River Avon Our Water Environment + (CBec Eco Engineering)
- Case study:Reméandration du Geer à Grand-Axhe + (SAR Consult)
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency/ Geodata)
- Case study:Prologis Midpoint Park river restoration scheme + (Cascade Consulting)
- Case study:PROGETTO WETLAND - Volturno + (Caserta County)
- Case study:Sågarsfors + (Centre for Economic Development, Transport and the Environment fo Uusimaa)
- Case study:Timber float restorations at River Iijoki + (Centre for Economic Development, Transport and the Environment)
- Case study:Rio Tepice urban restoration + (Studio Blanchard-Gallo)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Chilterns Chalk Streams Project)
- Case study:Isar-Plan + (State Office for Water Management Munich)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Confederación Hidrográfica del Duero)
- Case study:Fluvial restoration in River Carrión + (Confederación Hidrográfica del Duero)
- Case study:Refilling the meanders of the Colostre + (Conseil Supérior de la Pêche-Departmental Brigade)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Consejeria de medio ambiente-Xunta de Galicia)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Consejería de Desarrollo Sostenible y Ordenación del Territorio)
- Case study:Meers - Floodplain lowering + (Consortium Grendmaas)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Consultores en Ciencies de la Conservació)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (County Administrative Board of Västra Götaland)
- Case study:Enler River enhancement project + (DCAL Inland Fisheries)
- Case study:Long Preston Deeps Flood Plain Project + (DEFRA agencies)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Danube Delta National Institute)
- Case study:Conservation of alluvial + (WWF Hungary, Danube-Drava National Park Directorate, Municipality of Mohács town)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Environment Agency)