Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Stony Stratford Sluices Bypass Channel + (Fishtek Consulting)
- Case study:Restoration project in Verde River + (ARIN (Arquitectos/Ingenieros Consultores S.A.))
- Case study:Rodley weir by pass channel + (ARUP)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (ASAJA)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (Aalto University)
- Case study:Upper River Nairn restoration project + (cbec eco-engineering UK Ltd)
- Case study:Environmental design Mandalsvassdraget + (Norwegian Institute for Nature Research (NINA))
- Case study:Restoration of the Charentonne in the Serquigny public garden + (General council of Eure and Lafosse &Fils SARL)
- Case study:Allt Lorgy River Restoration + (CBec Eco Engineering)
- Case study:ReNaturalize + (Aplysia, CESAN, AGERH)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aquanea)
- Case study:Welland for People and Wildlife Project + (UoL)
- Case study:Lodge Burn Flood Alleviation Scheme + (Atkins)
- Case study:Lugton Water Fish Barrier Easement + (Royal HaskoningDHV)
- Case study:Segura's River Bioremediation + (BIOPULCHER S.L.)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Fishtek Consulting)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Department of Agriculture & Rural Development Rivers Agency)
- Case study:Short Heath Brook Project + (Birmingham City Council/ Environment Agency)
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency/ Geodata)
- Case study:River Bulbourne at Boxmoor Weir Removal + (Box Moor Trust)
- Case study:Habitat measures Hollundbekken + (Bømlo municipality)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (C.H. Cantábrico)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (C.H. Cantábrico)
- Case study:Weir demolition in river Nansa, Cantabria + (C.H. Cantábrico)
- Case study:River restoration project in Sella, Asturias + (C.H.Cantábrico)
- Case study:Restoration of the marsh "Gallega" + (C.H.Guadalquivir)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (C.H.Guadalquivir)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (Jogosa Obras y Servicios, S.L.)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (SEFOEX, S.A.)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (C.H.Júcar)
- Case study:Restoration project in Turia River + (C.H.Júcar)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (C.H.Tajo)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (C.H.Tajo)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (C.H.Tajo)
- Case study:River Avon Our Water Environment + (CBec Eco Engineering)
- Case study:Reméandration du Geer à Grand-Axhe + (SAR Consult)
- Case study:Prologis Midpoint Park river restoration scheme + (Cascade Consulting)
- Case study:PROGETTO WETLAND - Volturno + (Caserta County)
- Case study:Sågarsfors + (Centre for Economic Development, Transport and the Environment fo Uusimaa)
- Case study:Timber float restorations at River Iijoki + (Centre for Economic Development, Transport and the Environment)
- Case study:Rio Tepice urban restoration + (Studio Blanchard-Gallo)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Chilterns Chalk Streams Project)
- Case study:Isar-Plan + (State Office for Water Management Munich)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Confederación Hidrográfica del Duero)