Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the previous riverbed of the Dadon + (Water Agency)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Water Agency)
- Case study:Ennerdale Mill Weir Removal + (West Cumbria Rivers Trust)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (West-Transdanubian Water Management Directorate)
- Case study:Wild Wylye Phase 1 + (Wiltshire Wildlife Trust)
- Case study:Cudworth dyke restoration project + (Yorkshire Water)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (agence de l’eau, DIREN)
- Case study:Land acquisition on the banks of the Ouche River + (agence de l’eau, Office national de l’eau et des milieux aquatiques (Onema).)
- Case study:Upper River Nairn restoration project + (cbec eco-engineering UK Ltd)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (syndicat de la basse vallée de l’Ain (SBVA))