Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of Vesselina River + (10 - 50 k€)
- Case study:Hadfield Weir Fish Pass + (10 - 50 k€)
- Case study:Welland for People and Wildlife Project + (10 - 50 k€)
- Case study:Twineham Weir Removal & In-channel Enhancements + (10 - 50 k€)
- Case study:Ennerdale Mill Weir Removal + (10 - 50 k€)
- Case study:MediCyn + (10 - 50 k€)
- Case study:River Wensum Restoration, Reach 3a Costessey + (10 - 50 k€)
- Case study:Broadwater Brook + (10 - 50 k€)
- Case study:Resilient River + (10 - 50 k€)
- Case study:Upper Cringle Floodplain Restoration Project + (10 - 50 k€)
- Case study:River Cole Restoration + (10 - 50 k€)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (100 - 500 k€)
- Case study:Agreed definition of mobility area for the Adour + (100 - 500 k€)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (100 - 500 k€)
- Case study:Habitat and water flow restoration on River Rábca + (100 - 500 k€)
- Case study:Arborfield nature like bypass and weirs project + (100 - 500 k€)
- Case study:Cudworth dyke restoration project + (100 - 500 k€)
- Case study:Rodley weir by pass channel + (100 - 500 k€)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (100 - 500 k€)
- Case study:Rewilding the Rom + (100 - 500 k€)
- Case study:Boosting slivso + (1000 - 5000 k€)
- Case study:Remediation and revitalization of Séd-Nádor stream + (1000 - 5000 k€)
- Case study:Habitat Enhancements, River Glaven at Wiveton, Norfolk + (1000 - 5000 k€)
- Case study:Improving the structure of the Lahn-patak in Hungary + (50 - 100 k€)
- Case study:Eddleston water + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (50 - 100 k€)
- Case study:River Don Restoration project + (50 - 100 k€)
- Case study:Nobles Green Ditch River Restoration + (500 - 1000 k€)
- Case study:Gilev's Grove reconstruction + (500 - 1000 k€)
- Case study:Short Heath Brook Project + (5000 - 10000 k€)
- Case study:Habitat Enhancments, Reepham Stream, River Blackwater, Norfolk + (5000 - 10000 k€)
- Case study:River Colne Riparian Tree Planting + (5000 - 10000 k€)
- Case study:Forest Halt, Saltburn Valley Gardens + (5000 - 10000 k€)
- Case study:Bowston Weir Removal + (5000 - 10000 k€)
- Case study:Ecological Restoration of Natural Lake Pochina + (Less than 1 k€)
- Case study:Enhancement of the River Crouch following a pollution incident + (Less than 1 k€)
- Case study:Knock Burn low flow channel + (Less than 1 k€)
- Case study:Off-Channels Restauration + (Less than 1 k€)
- Case study:Limestone Ribble Restoration Project + (Less than 1 k€)