Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the previous riverbed of the Dadon + (1 - 10 k€)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (1 - 10 k€)
- Case study:Allt Lorgy River Restoration + (1 - 10 k€)
- Case study:Rio Tepice urban restoration + (1 - 10 k€)
- Case study:Wild Wylye Phase 1 + (1 - 10 k€)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (1 - 10 k€)
- Case study:Day Brook Restoration - Gedling + (1 - 10 k€)
- Case study:Saving Chiswick Eyot + (1 - 10 k€)
- Case study:ReNaturalize + (1 - 10 k€)
- Case study:Bourne End Recreation Ground River Enhancement Project + (1 - 10 k€)
- Case study:Stony Stratford Sluices Bypass Channel + (1 - 10 k€)
- Case study:River Calder Large Wood Structure installation + (1 - 10 k€)
- Case study:DUMMY TEST Daylighting Sorum + (1 - 10 k€)
- Case study:TEST Deculverting the Texas Valley Stream 1 + (1 - 10 k€)
- Case study:Stainby Road, Colsterworth + (1 - 10 k€)
- Case study:Removal of five Lakes on the Val des Choues stream + (10 - 50 k€)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (10 - 50 k€)
- Case study:Valtellina 2005 – New green system + (10 - 50 k€)
- Case study:PROGETTO WETLAND - Volturno + (10 - 50 k€)
- Case study:Matasaru Area - A new life on the river Arges + (10 - 50 k€)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (10 - 50 k€)
- Case study:Restoration of Vesselina River + (10 - 50 k€)
- Case study:Hadfield Weir Fish Pass + (10 - 50 k€)
- Case study:Welland for People and Wildlife Project + (10 - 50 k€)
- Case study:Twineham Weir Removal & In-channel Enhancements + (10 - 50 k€)
- Case study:Ennerdale Mill Weir Removal + (10 - 50 k€)
- Case study:MediCyn + (10 - 50 k€)
- Case study:River Wensum Restoration, Reach 3a Costessey + (10 - 50 k€)
- Case study:Broadwater Brook + (10 - 50 k€)
- Case study:Resilient River + (10 - 50 k€)
- Case study:Upper Cringle Floodplain Restoration Project + (10 - 50 k€)
- Case study:River Cole Restoration + (10 - 50 k€)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (100 - 500 k€)
- Case study:Agreed definition of mobility area for the Adour + (100 - 500 k€)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (100 - 500 k€)
- Case study:Habitat and water flow restoration on River Rábca + (100 - 500 k€)
- Case study:Arborfield nature like bypass and weirs project + (100 - 500 k€)
- Case study:Cudworth dyke restoration project + (100 - 500 k€)
- Case study:Rodley weir by pass channel + (100 - 500 k€)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (100 - 500 k€)
- Case study:Rewilding the Rom + (100 - 500 k€)
- Case study:Boosting slivso + (1000 - 5000 k€)
- Case study:Remediation and revitalization of Séd-Nádor stream + (1000 - 5000 k€)
- Case study:Habitat Enhancements, River Glaven at Wiveton, Norfolk + (1000 - 5000 k€)
- Case study:Improving the structure of the Lahn-patak in Hungary + (50 - 100 k€)
- Case study:Eddleston water + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (50 - 100 k€)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (50 - 100 k€)
- Case study:River Don Restoration project + (50 - 100 k€)