Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rottal Burn + (post-restoration)
- Case study:Enler River enhancement project + (pre works channel)
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:Cornmill Gardens (QUERCUS) + (prior to works)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Restoration of R. Odelouca 2 + (restored section: invasive species were erradicated and replaced by a willow after a cribwall structure)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Stage 0 channel restoration + (before works)
- Case study:Letting the Dove Flow + (An example of weir breaching)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Wandsworth Riverside Quarter + (terrace just after constuction)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (A distribution weir allows to get water into the meander (October 2008).)
- Case study:River Hogsmill Restoration Project + (The River Hogsmill at Watersedge - February 2007)
- Case study:Černý potok stream restoration scheme + (excavation of the new channel)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Ålgårda Hyro power plant (photo. Outi Laamanen))
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (L’ouvrage du Pont Fourneau sur la Selle. Mars 2005 (Source: SIAHSA).)
- Case study:Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg + („ETZ-Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona (SI) and Bad Radkersburg (AT) 2010-2014 - New connection bridge between the border ©Stadtgemeinde Bad Radkersburg)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)